Nanjing Clover Medical
Technology Co., Ltd.
Tel: +8625-8461 0201
Fax: +8625-8461 0406
Email: [email protected]
Home
About Us
Contact Clover
Mobile
Incinerator
Small Incinerator Model
Model TS10 PLC
(10kg/hr.)
Model TS20 PLC
(20kg/hr.)
Model TS30 PLC
(30kg/hr.)
Model TS50 PLC
(50kg/hr.)
Model TS100 PLC
(100kg/hr.)
Large
Incinerator Model
Model
YD-30 (30kgs/Hr.)
Model
YD-50 (50kgs/Hr.)
Model
YD-100 (100kgs/Hr.)
Model
YD-150 (150kgs/Hr.)
Model
YD-200 (200kgs/Hr.)
Model
YD-300 (300kgs/Hr.)
Model
YD-500 (500kgs/Hr.)
Model
YD-600 (600kgs/Hr.)
Incinerator
Introduction
Company Certificate
¡¡
¡¡
¡¡
¡¡
¡¡
¡¡
¡¡
¡¡
¡¡
¡¡
¡¡ |
¡¡
Nanjing Clover Medical Technology
Co., Ltd.
Email:
[email protected]
Follow us
twitter.com/hiclovercom
Incinerator Model YD-100 is a middle
scale incineration machine for many different usage: for a middle
hospital sickbed below 500 units, for all small or big size family pets
(like Alaskan Malamute Dog), for community Municipal Solid Waste
Incineration, etc. The primary combustion chamber volume is 1200Liters
(1.2m3) and use diesel oil or natural gas fuel burner original from
Italy.
All our incinerator use stainless steel chimney, not steel.All our
incinerator have two combustion chamber at least, not single chamber.
All fuel burner from Italy made with famous brand, best quality.
300kgs per hour burning rate incinerator is well liked by market because
this model can be medical waste incineration equipment for big hospital
and also very good for other solid waste treatment with lowest cost,
even if big size animals also can be feed into the combustion chamber.
The primary combustion chamber volume is 2.4m3, big enough for common
size animals. For shipping transport, YD-300 can be loaded into 40¡¯feet
full high container.
Big size combustion chamber up to 4.0m3 and Internal Dimensions is 257 x
147 x 108cm with feeding door opening 108 x 128cm. This model can be a
small waste incineration factory with little amount of budget funds. If
end customer use this for farm to burn animals like cow, horse or camel,
contact with us now.
|
Model |
YD-600 |
|
Burning Rate |
600 kgs/hour |
|
Feed Capacity |
1100 kgs |
|
Primary Combustion Chamber |
5500 Liters |
|
Secondary Combustion Chamber |
1500 Liters |
|
Mix Combustion Chamber |
Yes |
|
Smoke Filter Chamber |
Yes |
|
Feed Mode |
Manual |
|
Voltage |
220V/380V |
|
Power |
2.24Kw |
|
Fuel Type |
Diesel Oil/ Natural Gas/LPG |
|
Burner |
Italy Original |
|
Oil Consumption (Diesel Oil) |
35--77 kg/hour |
|
Gas Consumption (Natural Gas) |
21.1--77.2 m3/hour |
|
Internal Dimensions |
300 x 147 x 125cm (primary chamber) |
|
External Dimensions |
360 x 220 x 475cm (without chimney) |
|
Temperature Monitor |
Yes |
|
Oil Tank Capacity(if oil fuel) |
500 Liters |
|
Door Opening |
108 x 128cm |
|
Chimney Length |
14.0 Meters |
|
Chimney Type |
Stainless Steel |
|
Equipment Gross Weight |
16500 kgs |
|
Operation Technical Specifications |
|
Paimary Chamber Temperature |
800¡æ--1000¡æ |
|
Secondary Chamber Temperature |
1000¡æ-1200¡æ |
|
Residency Time |
2.0 Sec. |
|
Burning Efficiency |
£¾98% |
|
Waste Lower Calorific Power |
3000Kcal |
¡¡
Medical waste incinerator
Standard requirement:
The medical incinerator should meet the Europeanstandards 2000/76/EC.
--China standards
Basic requirements:
Capacity 100kg/hr
---yes
Work for 24 hours
.---16 hours
Unit should have enough combustion room consists of two combustion
chambers (mounted vertically)
---yes
Unit should supply with control methods for air entry to the primary and
secondary chambers and hence incineration of the waste is accomplished.
---yes
The unit charging is done automatically and have an option to be done
manually.
---yes
The ash removal is done automatically and have an option to be done
manually
-- manually only
The unit should have a dry filtering unit.
---none
The unit should be controlled from the control panel.
---yes
control panel :
Should show different tasks of operation using (PLC)
-Temperature in combustion chamber
---yes
-time of operation and combustion.
---none, have timer device only
-different pressures.
---none
-amount of air in combustion.
---none
-efficiency indicator.
---none
-emergency system in case of increasing pressure or temperature.
--yes
f- Time for gas passing:
Minimum time required for passing to combustion chamber for oxidizing
0.5 seconds at 800 degree Celsius.
---2.0 sec.
1- design details:
A-primary combustion chamber:
Oxidize all waste to combustion residuals and temperature not less than
800 degree Celsius.
---800-1000 degree
b- Secondary chamber:
Continue combusting combustion gas residuals and hanging particles using
additional burner temperature not less than 1100 degree Celsius and this
conditions is reached by harmonizing between temperature and time of
passage to ensure adequate oxidizing supplying enough air to ensure
turbulence of gas all the time this is controlled from control panel.
---1000-1200 degree
i- burners:
use diesel , natural gas , liquefied petroleum gases according to
standards burners should have main vent to be used for protection.
---diesel oil or natural gas
2- materials:
-the chamber should be covered from inside with refractory brick with
thickness 22 cm aluminum silicate insulation 11cm thickness with the
ability to change this layer .
---yes
All surfaces made of carbon steel should be surface treated and covered
with primary layer. Thatholds the working condition and easy to clean it
is recommended that materials are chosen according to standard codes.
---yes
Chimney exhaust gas filtration:
To meet the European standard 2000/76/EC
---china GB18484-2001
Chimney height should not be less than 12 meter and radius 8 cm.