Medical Waste Incinerator            
         

         
     
         

 

 Nanjing Clover Medical Technology Co., Ltd.
 Tel: +8625-8461 0201
 Fax: +8625-8461 0406
 Email: [email protected]
 

 Home

 About Us

 Contact Clover

 Mobile Incinerator

 Small Incinerator Model

 Model TS10 PLC (10kg/hr.)

 Model TS20 PLC (20kg/hr.)

 Model TS30 PLC (30kg/hr.)

 Model TS50 PLC (50kg/hr.)

 Model TS100 PLC (100kg/hr.)

 Large Incinerator Model

 Model YD-30 (30kgs/Hr.)

 Model YD-50 (50kgs/Hr.)

 Model YD-100 (100kgs/Hr.)

 Model YD-150 (150kgs/Hr.)

 Model YD-200 (200kgs/Hr.)

 Model YD-300 (300kgs/Hr.)

 Model YD-500 (500kgs/Hr.)

 Model YD-600 (600kgs/Hr.)

 Incinerator Introduction

 Company Certificate

 

 

 

 

 

 

 

 

 

 

Nanjing Clover Medical Technology Co., Ltd.

 Email: [email protected]   Follow us twitter.com/hiclovercom

 Incinerator Model: TS20 PLC

 

    
Items/Model TS20(PLC)
Burn Rate 20 kg/hour
Feed Capacity 40kg
Control Mode PLC
Combustion Chamber 210L
Internal Dimensions 65x65x50cm
Secondary Chamber 110L
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.5Kw
Oil Consumption (kg/hour) 7.8--16.3
Gas Consumption (m3/hour) 8--15.7
Temperature Monitor Yes
Temperature Protection Yes
Oil Tank 100L
Feed Door 45x40cm
Chimney 3Meter
Chimney Type Stainless Steel
1st. Chamber Temperature 800--1000
2nd. Chamber Temperature 1000-1200
Residency Time 2.0 Sec.
Gross Weight 2200kg
External Dimensions 160x110x130cm

 

  

ADDITIONAL MACHINE DETAILS/SPECS

 

Power Supply:

The plant must be supplied with three (3) phase Power Supply.

This it require isolator and distribution board with circuit breaker.

The plant must have emergency stop button and fire fighting equipment.

 
 

Language:

All information/labels, operations and maintenance manuals to be written in English.

 
 

Oil / Fuel:

Preferable diesel. The height of the tank must have specific measurement (height) from the floor finish level to the burner in order to go easily fuel flowing to the burner pump.

 
 

Burner:

All burner must have all required connections ie. Connection to the power supply, fuel supply, and return pipe the fuel tank. The size of the pipe must be considered in order to get enough pressure to the burner.

 
 

The number of burners required are 2 or 3 to the primary chamber and 2 or 3 to the secondary chamber. Require Air dumper to supply oxygen in the chamber.

 
 

Loading of waste:

System temperature should allow operator to work comfortably otherwise should be automatic.

 
 

Fuel tank and connection:

The fuel tank size must consider the number of burner¨s, time and volume of waste. Need to have all two lines that is supply and return pipe from the burner to the tank.

 
 

Must have proper means fuel filling to the tank.

The tank size (volume) to be 500 Ltrs so as to avoid refilling of fuel during incineration process. The waste volume generation per day range between 1000-1500kg. Therefore the fuel tank needs to have capacity to burn such volume of waste.

 
 

Smoke standard:

The smoke standards required need to be WHO standards.

Air pollution control equipment/devices (APCD) to be in place for emissions control to ensure best practice.

Dioxin and Furan emissions are the most public health risks from incinerators.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

         
           

          Nanjing Clover Medical Technology Co., Ltd.