¡¡
¡¡
|
¡¡
Nanjing
Clover Medical Technology Co.,Ltd.
Tel:
+86-25-8461 0201
Fax:
+86-25-8461 0406
Website:
www.cloveridea.com.cn
Email:
cloverincinerator@Gmail.com
About Us
Small Incinerator
Incinerator YD10C
Incinerator YD20C
Incinerator YD30C
Incinerator YD50C
Medical Incinerator
Incinerator YD30
Incinerator YD50
Incinerator YD100
Incinerator YD150
Incinerator YD300
Incinerator YD500
Incinerator YZ20
Incinerator YZ50
Incinerator YZ100
Incinerator YZ150
Animal Cremation
Incinerator Burn Rate
10kgs per hour
20kgs per hour
30kgs per hour
50kgs per hour
100kgs per hour
150kgs per hour
300kgs per hour
500kgs per hour
Incinerator Burner
Light Oil Burner
Gas Burner
YZ Incinerator
Certificate
How to Buy Incinerator
Market Analytics
Contact Us
¡¡
¡¡
¡¡
¡¡
|
CLOVER Incinerator
Call us on 0086-25-8461 0201
[email protected]
China Medical Incinerators /
Animal Cremation / Waste Incinerators
¡¡
¡¡
Model |
YD-100 |
Burning Rate |
100 kgs/hour |
Feed Capacity |
200 kgs |
Paimary Combustion Chamber |
1200 Liters |
Secondary Combustion Chamber |
500 Liters |
Mix Combustion Chamber |
Yes |
Smoke Filter Chamber |
Yes |
Feed Mode |
Manual |
Voltage |
220V/380V |
Power |
0.9Kw |
Fuel Type |
Diesel Oil/ Natural Gas/LPG |
Burner |
Italy Original |
Oil Consumption (Diesel Oil) |
14--28 kg/hour |
Gas Consumption (Natural Gas) |
10--32.2 m3/hour |
Internal Dimensions |
130 x 100 x 90cm (paimary chamber) |
External Dimensions |
220 x 180 x 360cm (without chimney) |
Temperature Monitor |
Yes |
Oil Tank Capacity(if oil fuel) |
300 Liters |
Door Opening |
55 x 80cm |
Chimney Length |
10.0 Meters |
Chimney Type |
Stainless Steel |
Equipment Gross Weight |
4300 kgs |
Operation Technical Specifications |
Paimary Chamber Temperature |
800¡æ--1000¡æ |
Secondary Chamber Temperature |
1000¡æ-1200¡æ |
Residency Time |
2.0 Sec. |
Burning Efficiency |
£¾98% |
Waste Lower Calorific Power |
3000Kcal |
MEDICAL WASTE INCINERATOR
SPECIFICATIONS Capacity (4000 kg/day). The unit should have the following
features:
* Automatic feeding
* Automatic ash / leftovers removal
* Flue gas filtration system.
* The technical & financial offer should include installation & testing and
staff training.
***The offer should be itemized. IMPORTANT INFORMATION:
1 Emission standards : ( EU ) ¡ª
2 Waste type: Hazardous Medical Waste
3 Approximate moisture content: max. 30%
4 Glass content: max. 15%
5 Building Roof Height: 8 meters
6 Height of chimney above roof (required): at least 3 meters
7 Fuel to be used : No. 2 ( diesel ) ( Fuel specifications attached )
8 Power: 380 V, 3 phase
9 Space available inside the existing building: (Bidders should visit the
building to choose the best location for installation coordinating with
university engineers)
10 Waste filled in (max. 70X120 cm ) polyethylene bags ¨C
I would like to list the following points that are mentioned in the special
conditions ( in Arabic), and are not mentioned in the technical specs:
1- The price of each of the following components should be listed separately, as
the university might not order it,:
¨C Flue gas cleaning system. If you can send us two alternatives, dry scrubber
and wet scrubber type, it would be great.
¨C Automatic feeder
¨C Automatic ash removal
¨C Continuous emissions monitoring and recording system
2- The delivery period is very important. The whole tender period is 120 days,
including supply, transportation and installation of the unit???!!!
3- The offer should include separately a priced list of reco |
¡¡ |
¡¡ |