Efficient Waste Management for Remote Hydropower and Infrastructure Camps

Share this post on:

Efficient Waste Management for Remote Hydropower and Infrastructure Camps


Remote construction and hydropower development sites―such as mountain hydropower stations, tunnel projects, and bridge construction zones―often face serious waste management challenges. Limited transport access, rugged terrain, and environmental restrictions make traditional waste disposal methods impractical. In these conditions, mobile trailer-type incinerators provide a compact and efficient solution for on-site waste reduction and sanitation control.

Challenges in Construction Camp Waste Disposal

Hydropower and civil engineering camps in regions like Southeast Asia, East Africa, and Central America typically generate mixed wastes: construction packaging, plastic bags, cloth residues, and daily household garbage. Due to remote locations and temporary project schedules, centralized landfill or collection systems are rarely available. Open burning or uncontrolled dumping causes odor, pest problems, and non-compliance with environmental guidelines.

Why Trailer-Mounted Incineration Works Best

The trailer-mounted incinerator from HICLOVER is designed for flexibility and quick deployment. It can be towed to different work fronts, requires minimal installation, and includes a hydraulic lifting platform for easier ash removal and maintenance. Built with heavy-duty steel frames and refractory-lined combustion chambers, it ensures consistent destruction of mixed waste streams under high-temperature combustion with minimal emissions.

Key advantages:

  • Mobility: Ideal for shifting worksites along dam projects or road tunnels.

  • Diesel or LPG operation: Reliable where electric power is unstable.

  • Two-chamber design: Primary combustion chamber for solid waste; secondary chamber for smoke and gas treatment at >1100°C.

  • Ease of maintenance: Compact structure with detachable chimney and hydraulic lifting door.

  • Compliance: Meets China GB18484-2020 and WHO emission recommendations for field incineration.

Application in Global Infrastructure Development

In mountainous areas such as northern Pakistan, Ethiopia’s Blue Nile corridor, or Laos hydropower zones, construction consortia face the same logistical problem―how to process waste safely without transporting it over difficult terrain. A self-contained, trailer-mounted incineration unit enables each camp to treat its waste locally, protecting rivers, reducing pest attraction, and maintaining worker health standards.

These systems are also compatible with containerized storage or wet scrubber options, depending on local environmental authority requirements.

Sustainable Engineering for Remote Worksites

Deploying modular, movable waste incinerators aligns with the sustainability goals of modern construction projects. They reduce pollution risk, save transportation costs, and support the circular economy by converting combustible waste into sterile ash. HICLOVER’s modular systems can integrate with mobile water treatment, power generation, or air filtration units, forming a self-sufficient environmental protection package.

Learn More

Explore product configurations and mobile waste treatment options:

HICLOVER C Engineering Reliable Waste Treatment for Remote Construction Projects Worldwide.

Mobile: +86-13813931455(WhatsApp)

Email:     [email protected]     
Email:     [email protected] 

 

2025-11-03/13:56:22

Incinerator Items/Model

HICLOVER TS100(PLC)

 

Burn Rate (Average)

100kg/hour

Feed Capacity(Average)

150kg/feeding

Control Mode

PLC Automatic

Intelligent Sensor

Continuously Feeding with Worker Protection

High Temperature Retention(HTR)

Yes (Adjustable)

Intelligent Save Fuel Function

Yes

Primary Combustion Chamber

1200Liters(1.2m3)

Internal Dimensions

120x100x100cm

Secondary Chamber

600L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Burner Type

Italy Brand

Temperature Monitor

Yes

Temperature Thermometer

Corundum Probe Tube, 1400℃Rate.

Temperature Protection

Yes

Automatic Cooling

Yes

Automatic False Alarm

Yes

Automatic Protection Operator(APO)

Yes

Time Setting

Yes

Progress Display Bar

3.7 in” LCD Screen

Oil Tank

200L

Chimney Type

 Stainless Steel 304

1st. Chamber Temperature

800℃–1000℃

2nd. Chamber Temperature

1000℃-1300℃

Residency Time

2.0 Sec.

Gross Weight

7000kg

External Dimensions

270x170x190cm(Incinerator Main Body)

Burner operation

Automatic On/Off

Dry Scrubber

Optional

Wet Scrubber

Optional

Top Loading Door

Optional

Asbestos Mercury Material

None

Heat Heart Technology(HHT)

Optional

Dual Fuel Type(Oil&Gas)

Optional

Dual Control Mode(Manual/Automatic)

Optional

Temperature Record

Optional

Enhanced Temperature Thermometer

Optional

Incinerator Operator PPE Kits

Optional

Backup Spare Parts Kits

Optional

Mobile Type

Optional:Containerized/Trailer/Sledge Optional

Share this post on: