Temperature Level Show & & & & PLC Control Instance Main Burning Chamber Incinerator Text ***Primary […]
Waste Burner (Containerized Mobile Heater) Ability: Normal 50 kgs per human resources Style CA50 Interior Dimensions […]
Model TS30 oil fired waste small incinerator 30kgs/hr. Items/Model TS30( PLC) Picture Melt Price Average 20-30 […]
Waste Incinerator Model TS150 PLC, Overview Construction is dual/double combustion chamber with 02 sets oil burner, […]
Key Features: — — — — Complete selection burner with Saved money Tiny Scale burner, Standard […]
*** 3 sets Burners *** Good for animals or big pets *** Double Combustion chamber *** […]
*** Primary combustion chamber & secondary combustion chamber *** Smoke filter chamber(dry scrubber) *** stainless steel […]
*** Double Combustion Chamber *** PLC auto control operation *** stainless steel chimney *** smoke filter […]
Presently, we supply different series for local customer requirements and design  updated incinerator with our leading technology. The updated design feature  of our range of incinerators make them one of the most cost effective in the world. Key Features: * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long lifetime.  * High temperature, long lifetime of incinerator. * Free or minimum installation on site. * High burn rate, from 10kgs to 600kgs per hour, up to 10ton per day. * PLC Control Plane for Intelligent operation.  * New Design for pet animal cremation business. * One year warranty on incinerator and parts in stock. It features unique and advanced merits with compact size, high burning effect,  reasonable burning technology, high degree of non-harm etc.It is an ideal  choice for waste treatment of hospitals, hotels and various areas. Features: […]
Smallest waste incinerator for small hospital  average 10kgs per hour.  with double(2) sets burner. Tools Technical […]
Merchandise Specification Variation YD-30C (client made version) Main Product List Main Burning Chamber( Text stainless-steel) Second […]
Primary chamber:Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.Secondary Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.Third Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.Integrated dual flu gas washer: Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.Chimney:Heavy duty 5mm or more stainless steel casing mild steel casing.Stack cap/spark arrestors.Control Panel:a.Temperature Monitoring with 4 digit display.b.Thermostat control device for burner (fuel saver)c.Temperature control 0-12 hours.d.Integral fan timer control
Primary chamber:Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.Secondary Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.Third Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.Integrated dual flu gas washer: Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.Chimney:Heavy duty 5mm or more stainless steel casing mild steel casing.Stack cap/spark arrestors.Control Panel:a.Temperature Monitoring with 4 digit display.b.Thermostat control device for burner (fuel saver)c.Temperature control 0-12 hours.d.Integral fan timer control
Model A1500 (customer made layout ) Interior Measurements 150 x 100 x 96cm Acceptable For Family […]
It is an auto reader for Bacillus Stearothermophilus to test the spore discharge after treatment (sterilization) […]
Key Product Checklist Main Burning Chamber Additional Combustion Chamber Mix-Combustion Chamber Smoke Filter Chamber Incinerator Control […]
We complete this job in year 2010 to 2011 and distribution to Hochiminh port, Vietnam with […]
TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals   All the incinerators to be supplied and installed must […]
There are 03 sets Design YD-100 circulation to Iraq between year 2013 to 2014. The heater […]
Documents to be submitted as following; Fabricators accreditations Test report to prove ZERO harmful emission level […]
2nd Chamber (Liters). Items/Model 1000 ℃ -1200 ℃. UNDOUBTEDLY. Mix-Combustion Chamber. 30 kgs/Hr. 200. Outdoors Dimensions […]
news from: http://www.chinadaily.com.cn/a/202002/01/WS5e347a86a310128217273ead.html  THAT proclaims split constitutes global public wellness emergency China guaranteed on Friday to work […]
News from: https://www.thestar.com.my/news/nation/2020/01/26/wuhan-virus-china-mobilises-medical-teams-to-fight-new-coronavirus  WUHAN (Bernama): China is mobilising medical staff to aid Wuhan, the centre of the […]
———————————–   Failure to establish the authenticity of the certificate the bidder is liable to render […]
50kgs per hour incinerator with two chambers suppliers from china *Aveage 50kgs per hour *Double chamber […]
30kgs per hour(average) medical waste incinerator, design dual  combustion chambers(primary chamber and secondary chamber),  smoke filter […]
1) Policy – Waste disposal management shall be taken special note to reduce hospital infection. – Infections […]
Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door Things Side Loading Door Top Loading […]
The incinerator shall be equipped with water injection nozzle link. If the temperature in the primary […]
The incinerator shall be supplied with a range of interconnecting ductwork between the thermal reactor outlet […]
“PYROLYTIC” combustion, by controlling the gasification of waste The incinerator manufacturer must prevent the discharge of […]
The incinerator to be completely assembled logic and wired function tested in the factory, before dispatch. […]
* Burner with fuel, mono-bloc casting directing type with flat flame, lighting and security of electronic […]
This equipment quality structural for kinds of site, like hospital, environmental department,  animal cremation agencies, etc.  […]
Incinerator Model A1500, Intro Construction is dual/double combustion chamber with 03 units oil/gas burner,  batch load […]
Animal Crematory Burner Ability: Regular 80kgs per feeding Thing Spec Design A900 Interior Measurements 120 x […]
This model is small-scale waste incineration equipment for small waste output.  Construction is dual/double combustion chamber […]
include automatic stop/start programmed timer control, flame failure gear and ignition failure gear to close off […]
Oil tank with 2000Liters capacity Items/Model TS150( PLC) Image Principle Waste Incineration Therapy Burn Rate Requirement […]
The incinerator plant will incorporate a control panel for its own operation. On the control panel […]
(adsbygoogle = window.adsbygoogle || []).push({}); Incinerator Variation CA100, Summary combustion chamber with 02 units oil burner, […]
Waste Incineration Treatment Burn rate (rate of waste incineration) -at least 50 kg per hour  Oil tank […]
All particles of this waste should achieve a high degree of sterilization instead of just “disinfection” […]
HICLOVER incinerator exert the advantages and discard the disadvantages of the same kind of equipment at domestic […]
Double Combustion Chamber,Double Italy Burner,Smoke Filter Included,Burning Rate: 50-200kgs per hour optional,Primary Combustion Chamber: 1.57M3(1570Liters),Incinerator Mainbody […]
Containerized Incinerator is one type of mobile incinerator. we build the incinerator and mounted the incinerator […]
Medical Waste Shredder    Ability: Should be 150 liters.  Should be capable to shred […]
Petrol: diesel   Consumption: 8-10liter/hour   Capacity: to cremate (carrion and spoils) 350-400kg/hour   Temperature: 900-1350?C […]
The publications listed below form a part of this specification to the extent referenced. The publications […]
Piping and stack connection locations and sizes.   Technical data including temperature rating and arrangement of […]