Equipment Access Openings: Organize all piping and equipment to allow access to openings without disassembly of

piping or equipment. Provide space which permits full opening of all doors, panels, and other access openings.

 

  1. Operating Space: Do not reduce or alter personnel working spaces shown except with prior approval of Resident

Engineer.

 

  1. Fuel Oil System: Coordinate set pressure of house fuel oil system with requirements of burner mounted pumps. Do

not exceed blood pressure limits (typically 14 kPa or 2 psi or less), or suction lift capabilities of burner

mounted pumps. Ability of destruction in weight: 60 Kg/h. It should be able to operate not less than 10 hours/day

3. This incinerator has to be able to destruct all combustible wastes produced by hospitals, private clinics,

laboratories, institutes, etc…

4. “PYROLYTIC” combustion, by controlling the gasification of waste.

6. The incinerator must prevent the discharge of smoke and fine dust, during the loadings. It should be able to reduce the quantity of wastes by 98%.

8. It should be able to hold emission in the second burn with gasoline residence of less than 2 seconds.

9. The incineration should be wholly free from visible smoke in addition to offensive odours.

10. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg

The Temperatures of combustion: Minimum will be 850oC and max 1400oC

Post combustion: >1100oC.

11. The Internal diameter of the Chimney: Ø 400 and its height: 8 m

12. The Volume of the combustion chamber: 1.200 L

13. The Dimension of the door for loading in cm: 70×70.

14. Burner operation should be Automatic On/Off

15. Fuel: petrol

16. The provider must provide  necessary information for the best of  the installment

This incinerator with”PYROLYTIC” combustion must have:

17. A combustion chamber of waste:

* Perfectly tight doorway for the manual loading of waste. The loading should be Manual, Batch Load

* A reduction of light which the use is restricted to the ignition of waste.

* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating

out of refractory.

* The insulation of the combustion chamber ought to be composed of refractory bricks, having a

high content of aluminium and insulates bricks to be able to guarantee a minimum temperature on

the outside sheet metal.

* Composition of the refractory;

 

Refractory concrete :

. Thickness      : ≥100 mm

. Nature: 42 percent of Al203

Insulate in fibrous panels:

. Thickness: ≥75 mm

Nature: Calcium silicate.

* Burner of light of waste, with fuel, standard mono-bloc casting guiding  plunging flame, lighting and safety of

electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.

Nature: Calcium silicate.

* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding  plunging flame, lighting and safety of

electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.