pet animal cremation equipment

A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of injection of air allowing a total recombustion of gases,

* A device of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases burnt.

* Carcass in strong sheet steel with assistance of link.

* Composition of the refractory;

Refractory concrete:

Thickness: ≥150 mm

Character: 65% of Al203

Insulate in fibrous panel:

Thickness: ≥85 mm

 Character: Calcium

* Burner with fuel, mono-bloc casting directing type with horizontal flame, lighting and security of electronic ignition,

permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* A secondary injection of air to guarantee perfect oxygen content. A control box ensuring the complete cycle of combustion. Fan:

* Electro-ventilator distributing the secondary air, the regulation of the air flow being completed by valves and

after the control of the automatic cycle. Controls and regulations:

Control box watertight to dust, including:

 

* A switch circuit breaker for each engine (ventilators and burners).

* A timer with adjustable temporization for the regulation of every burner.

* A regulator with digital viewing for the temperature of combustion.

* A regulator with digital viewing for the temperature of postcombustion.

* Electric box.

 

batch de ashing.

22. The supplier must give batches of spare pieces of first urgency and consumable of the incinerator.

23. The installed incinerator must bear a 1 year guarantee.

24. The supplier shall perforn an onsite installation of the incinerator.

  1. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual

the factory; it’ll consist of curative and preventive maintenance, and the usage of machine, etc

  1. Process Filtering system : Scruber to be mentionned as optional
  2. Emission Standards Compliance: BS 3316 or équivalent standard
  3. Capacity to treat Plastic: Not less than 40% by weight
  4. CE Manufacturing Compliance: BS EN 746-2-1997

22.The supplier must give batches of spare parts of first urgency and consumable of the incinerator.

23.The installed incinerator must bear a one year guarantee.

24.The supplier shall perforn an onsite installation of the incinerator.

  1. The technical training of operators will have to be provided and given by a technician from

the factory; it will consist of curative and preventive maintenance, and the use of machine, etc