china animal cremation

The panel shall comprise of a compartment for the connection of power and control cables. Passage for power cables and

control cables shall be produced by the bottom portion of the switchboard.

 

 

 

 

The drawer shall be locked in the remote place by padlocks.

 

1. Two systems are required to be set up in the south east of the Kingdom of Saudi Arabia. Both systems will be used by

custom authority to burn various sorts of drugs. All desire equipment must be supplied. Warrantee:  booth systems must be provided with 3 years warrantee from the date of approval. All needed spare

parts, preventative maintenance repair and corrective maintenance has to be included in the price and supplied to the

customer.

3. All needed water and electric connections must be supplied. Both systems must be of high quality and have to be environmental friendly. The capacity of each system should be up to 100 kg/hr. The system must have automatic feeding. Each system must consists of two burning  rooms, one primary room for burning the medication and another room for burning

the gases  that emit as a result of primary burning. The oven must be made of steel that is rust resistance and with depth less than 6 mm.

9. Each system has to be of high efficient in burning different sorts of drugs, and should have 99.9% efficacy for

burning organic materials.

10. Waste products should not exceed 5 percent.

11.

12. System should use diesel (HSD) as fuel and should not consume more than  8 to 10 lt/hr.

13. Each system should be supplied with fuel tank  of dimensions sufficient to operate the system for one complete day.

14. The temperature in the primary area should be 850 C ± 50 C. the system should also be able to operate up to 1050

C ± 50 C. the system ought to be capable of continues operation and must be provided with cement layer insulator with

adequate depth.

15. Oven should be supplied with heat insulator to allow easy operation.

16. Gas should remain in the secondary area for more than 1.5 second.

17. The primary burning room  should have a minimum of two burners.

18. The secondary burning area should have one burner.

maintenance.

20. Each system should have filtering system for gas processing with 2 tanks using ordinary water. Each water tank

should have capacity of 1000 lt and should be fixed into the system and supplied with water level indicator.

21. Each system should have special technology for separating waist humidity and products after gas processing.

22. Each system should have cooling capacity after surgery.

23. Each system m ought to be provided with exhaust tube with 250 mm diameter and 10 m high. The base of the exhaust

  1. Each system should have doors for ash, exit for air to the chimney and windows to allow looking inside and for

system should be 1000 mm. The exhaust pipe should be 6 mm and should be supply with heat insulator.  The exhaust

system ought to be supplied with pressure indicator. It should also supply with ladder and Lightning Arrestor.

24. Electric power: should be 220 volt, 3 phase, 60 Hz, and the motor should not be less than 15 HP.

25. Each system should be supplied with control panel and indicators and needed safety equipment and alarm systems. The

control panel should show at least temperature in both the primary and secondary rooms and injectors of the filters and

load.

26. Each system should be provided with alarm system for any breakdown or defect of any component of the system.

27. The following personal protective tools have to be supply:

a.Heat resistant garments for 20 persons.

 

control panel should show at least temperature in both the primary and secondary rooms and injectors of the filters and

load.

26.Each system should be provided with alarm system for any breakdown or defect of any component of the system.

27.The following personal protective tools must be provide:

a.Heat resistant garments for 20 persons.

 

Categories: