Category: waste-incinerator

Small Waste Incinerator, 10kgs per hour capacity, PLC control Items/Model TS10(PLC) Picture   Burn Rate Typical 10 kg/hour Feed Capacity Average 20kg/feeding Control Mode Programmable Logic Controller(PLC) Panel Combustion Chamber 100L Internal Dimensions 50x50x40cm Secondary Chamber 50L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 0.5Kw Oil Consumption (kg/hour) average 8.4kg/hour Gas Consumption (m3/hour) […]
Pre-assembled, containerized type Incinerator Model CA100 Picture Waste Treatment Medical Waste Incineration Treatment Feed Capacity Average 100-200 kgs per feed Burning Rate Average 100-120 kgs per hour Burning Time per Feed Average 1-2 hour Control Mode PLC(Programmable Logic Controller Incinerator) Voltage 220V Power 1.0Kw Gas Diesel oil Burner Italy Burner Feed Mode Manual Temperature Monitor […]
30kgs rate 60kgs feed oil and gas burner small waste incinerator for Afghanistan Machine Working Manner Oil or Gas + Power Voltage 220V Oil consumption (lit/hour) Average 13.3lit/hour/chamber Gas consumption (NG) (m3/hour) 16.0 (m3/hour) (NG) Gas consumption (LPG) (m3/hour) 11.7 (m3/hour) (LPG) Burning rate Average 30kg/hour Feed mode Manual Primary Combustion chamber 360 Liters Secondary Combustion […]
Mobile Small Scale Medical Waste Incinerator with Trolley(E-Power) or Wheel Model YD-30  Picture   Burning Rate  average 30 kgs/hour Feed Capacity average 40 kgs Paimary Combustion Chamber 200 Liters Secondary Combustion Chamber 100 Liters Mix Combustion Chamber Yes Feed Mode Manual Voltage 220V Power 0.59Kw Fuel Type Diesel Oil Burner Italy Original Oil Consumption (Diesel […]
Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system Per your advertisement for 300 kg.hr. Model — We need to know the price via return. How many Kg. Of Gas will be required for running this Model 10 hrs. everyday. We have our very own Freight Forwarding Agent. We had a Contract for […]
Incinerator Of Burning Capacity 30 kg/hr = 1 No The Incineration System comprises of: I. Main Incinerator with A. Refractory lined Main and Secondary Chamber. VII. Cyclonic kind droplet separator cum recirculation tank in Mild steel Between burner & tank. XVII. Operati ng tools & tackles like rake, hoe, shovel, two teeth scrapper. XVIII. Caustic […]
Biomedical Waste                    Any solid or liquid waste that might pose a threat of disease to humans including non-liquid tissue, body parts, blood or blood products and body fluids, laboratory and veterinary waste which contains human disease- causing agents, and discarded sharps (i.e. syringes, needles, scalpel blades).   Bottom Ash                                 The course non-combustible and unburned material […]
30 August 2013 Last updated at 21:18 BST Five councils in south east Wales have formed a partnership to take care of black bag waste in a bid to lower rubbish going to landfill. The authorities aim to incinerate waste which cannot be recycled and convert it into power in a new project that’s receiving […]
Australian combustion engineering proprietary 5 25kg/hour double chamber(LPG) incinerator or equivalent approved. Incinerator casing to be mild steel with 125mm refractory lining including primary and secondary chamber, insulated draft section above secondary chamber, package burners, digital temperature control systems, ash rake and poke, second doorway in main chamber, manual loading chute, semi automatic operated counter […]
Capacity: 20KG/Hr, Temp Range: 600 Deg. Fuel Supply: Natural Gas/Diesel Dual Combustion Chamber Complete Scrubbing System (Dual Resultant Gas Washer), Dual Blower, Chimney Height: 8m Electric Supply: 220/240Volt, Single Stage
Stack: WOOD PALLETS. • 95% REDUCTION OF SOLID WASTE • TEMPRATURES DURING THE COMBUTION PROCESS MUST EXCEED 1,500 °F FOR AT LEAST 1-HOUR • FIVE (5) YEAR COMPONENT WARRANTY FROM DATE OF ACCEPTANCE • AUTOMATIC LOADING SYSTEM • ABILITY TO INCINERATE WASTE PETROLEUM, OILS, AND LUBRICANTS • CAPABLE OF 24 HOURS OF CONTINUOUS USE We […]
1. Is the residence time over 2 seconds? 3. Could it be supplied as a continuous system? 4. Does it provide for control interventions to adjust waste feed, grate speed, and temperature, quantity and distribution of primary and secondary air? Mode of Heating: Heating Elements of primary and secondary air? 6. Does it include system […]
Burning rate: 250 Kg/hr. It should be able to Operate not Less than 10 hours/day This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc… Design Specification: Types A, B, C, D, and E of medical waste “PYROLYTIC” combustion, by controlling the gasification of waste. The incinerator […]
TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals   All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice […]
1) Policy – Waste disposal management shall be taken special note to reduce hospital infection. – Infections wastes shall be handled, stored strictly and burnt by a incinerator found at hospital site.   2) Waste Disposal Plan a)Classification – Medical wastes in hospital are classified as follows;   Infections Waste Specially-controlled waste Organ, needle, etc. Industrial waste […]
“PYROLYTIC” combustion, by controlling the gasification of waste The incinerator manufacturer must prevent the discharge of black smoke and dust that is fine, during the loadings. It shall have the ability to decrease the quantity of wastes by 98%. It shall have the ability to hold emission in the next burn with gas residence of […]
The incinerator plant shall incorporate a control panel for its operation. On the control panel we shall have a visual screen of the chamber temperatures. This visual display must control and monitor the incinerator along with his performance. Ability of destruction in weight shall be 60 Kg/h. It should be able to operate not less […]
Petrol: diesel   Consumption: 8-10liter/hour   Capacity: to cremate (carrion and spoils) 350-400kg/hour   Temperature: 900-1350?C   Operation temperature: -30~40?C   Incinerator weight: 1800-2000 kg   Volume: 0.70-0.80m/cube   Exterior dimension: 1.4-1.6*1.0-1.15m (L*W) An incinerator represents a comprehensive solution to the problem of disposal of all hospital waste types. The liquid gas is petrol. The […]
Complete combustion converts waste into inert bottom ash with minimal production of smoke, fly ash and toxic gases. Several factors influence this process including the heating value, wetness and chemical makeup of the waste itself, operating conditions in the burn chamber (i.e. temperature, holding time and turbulence) and operator skill. The method used is important […]
NB.: Civil works and some other relevant services for the installation and training of operators must be included in the incinerator’s cost. 22. Process Filtering system: Scruber to be mentionned as discretionary 23. 25. The technical training of operators will have to be supplied and given by a technician from Specification for the shelter of […]
18.     A room of post combustion of gases * A burner of combustion of gases, ?     ?     Nature: 65% of Al203 * A device of air inlet of cooling of waste gases, ?     . Nature: 42 percent of Al203 ?     * Carcass in solid sheet steel with support of connection. […]
d’inspection 7)Volume chambre postcombustion                                                                   2.1 m3 Est dimensionnée pour pouvoir  garantir  un temps de fumée de 2 secondes à 1100°C avec un pourcentage d’oxygène libre d’au moins 6%. ? Soupape de régulation de l’air motorisé selon les stages de cycle de fonctionnement et de la température 5. CHAMBRE DE POST COMBUSTION ? Affichage des  températures  […]
environment contract management firm with planned operations 2013 in Indonesia and Thailand, and 2014 in West & East Malaysia to execute those professional services in order to abide by the governments safety disposal requirements for hospital and medical, clinical waste in the region and to meet the higher technical standard in this particular field.small incinerators […]
7.     A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where: DRE = [(Win – Wout)/Win]*100 2.     If the minimum combustion temperatures aren’t maintained. Arsenic                                       As Barium                                        Ba 5.     All the emission to the air apart from steam or water vapour has to […]
china medical incinerator Ability ? Typical Daily Max/Min January Temperature, 2-12°C. ? Disposal of both non-hazardous and hazardous waste streams (per waste inventory) Design/Specifications ? Average Daily Max/Min June Temperature, 21-39°C ? The incinerators will be installed with visual alarms to alert operations of reduced temperature in the secondary chamber diesel fuel / mains power […]
Temperature Controlled Burner. Incinerators to be designed to meet the Norms of Pollution Control. Technology: Heavy-duty casing, to be a quality, rugged, dependable, economical Incinerator with relevant control, easy to operate and self-contained. Units to be pre-assembled, pre-piped, pre-wired & tested before Transfer / Export. Note: Similar Technology and / or Tenderers Proposals are welcome. […]
Waste Incineration HICLOVER Model TS75  Items/Model TS75(PLC) Picture Principle Waste Incineration Burn Rate Average 75 kg/hour Feed Capacity Average 150kg Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 770L Internal Dimensions 100x81x95cm Secondary Chamber 385L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 0.7Kw Oil Consumption (kg/hour) Average 16.9 Gas Consumption (m3/hour) *** […]
medical waste incinerator china, Design, supply and Fabrication ex works of a Single Surefire Manual Load TS50/1 Medical/General waste incinerator as detailed below: – ·         Waste type: Mixed Form o,1,2,3,&4 hospital/clinical bio hazard waste ·         Waste density: 125 to 350Kg/M3 ·         Waste CV: 4000 KCAL/kg ·         Moisture content: 10-25Percent ·         Estimated ash residue: 5-10Percent ·         […]
medical waste incinerator iraq price HICLOVER TS10 PLC 10kgs per hour Items/Model TS10(PLC) Picture   Burn Rate Average 10 kg/hour Feed Capacity Average 20kg/feeding Control Mode Programmable Logic Controller(PLC) Panel Combustion Chamber 100L Internal Dimensions 50x50x40cm Secondary Chamber 50L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 0.5Kw Oil Consumption (kg/hour) Typical 8.4kg/hour Gas […]
Item Specification Model YD-30C Main Product List Main Combustion Chamber(Main body stainless steel) Secondary Combustion Chamber(Main body stainless steel) Mix-Combustion Chamber Wet Scrubber( Washing Tower)(Main body stainless steel) Incinerator Control Case Chimney:5.0Meters *(Update to Stainless Steel, free cost) Italy gas burner: 02 sets Oil Tank (if oil fuel): 100Liters Automatic PLC controller incinerator plant with […]
In a simple design with a metal steel drum electric. including: Ancillaries High temperature painting for several of the incinerator. A combustion chamber with fireplace using a filter to retain ashes; Weight    1850kgs Supply of incinerator model PDR-18 with: ·        Ability 100 kg/hr of waste containing up to 85% moisture ?      With 2 diesel pipelines, […]
Large Capacity Animal Pet Cremation HICLOVER Model A1500 with E-Power Auto. Door Model A1500 Internal Dimensions 150 x 100 x 96cm Suit for Animal Cat – yes Dog – yes Pig – small Cow – small Main Product List Primary Combustion Chamber Secondary Combustion Chamber Mix-Combustion Chamber Smoke Filter Chamber Incinerator Control Case Chimney:10.0Meters *(Update to […]
hospital incinerator manufacturers, Waste streams of petrochemical unit collect and store in Transit and Sorting Center. –    Materials (wastes) that need to be stabilized before buried –    Buried materials The Incinerator Plant is output wastes incineration from various petrochemical units. In this project we want to incinerate all output wastes from petrochemical units and produced […]
Model YD-30 Mobile Type Picture   Burning Rate Average 30 kgs/hour Feed Capacity Average 60 kgs/feeding Chamber Main Body Stainless Steel Mobile Function With Wheel and Brake Main Combustion Chamber 280 Liters Secondary Combustion Chamber 150 Liters Mix Combustion Chamber Yes Feed Mode Manual Voltage 220V Power 1.5 Kw Fuel Type Diesel Oil Burner Italy […]
BURNING RATE: -100-150kgs per hour MINIMUM OPERATING TEMPERATURE: 800-1000 oC ( PRIMARY COMBUSTION ) MAX OPERATING TEMPERATURE: 1000-1200 oC ( AFTER BURNER COMBUSTION ) SECONDARY BURNING CAPACITY: COMPULSORY DENSITY INSULATION: 50 mm high Refractory capacity: min 114mm HEAVY DUTY REFRACTING LINING TO WITHSATND 17500C AVEARGE BURN OUT TIME: MAXIMUM 3HRS FUEL TYPE: FUEL OIL ( […]
Model A600, crematorium manufacturers Internal Dimensions 130 x 70 x 65cm Suit for Animal Cat – yes Dog – yes Pig – no Cow – no Main Product List Primary Combustion Chamber Secondary Combustion Chamber Mix-Combustion Chamber Smoke Filter Chamber Incinerator Control Case Chimney:5.0Meters *(upgrade to Stainless Steel, free cost) Italy oil/gas burner: 02 Components […]
Mobile Containerized Waste Incinerators pets or human cremation emergency use   Model CA-200 Picture Burning Rate Average 100 kgs/hour Primary Combustion Chamber 2000 Liters Secondary Combustion Chimney Yes Feed Mode Manual Voltage 220V Power 3.0 Kw Fuel Type Diesel Oil Burner Italy Original Oil Consumption (Diesel Oil) Average 53 kg/hour Internal Dimensions 200 x 100 x […]
medical waste diesel incinerator Burning Rate:47.5–50kg/hour 3) Compliance with applicable Haitian standards and regulations. Operational characteristics Refractory Casting:Minimum 65mm 7) Mounted on a secure foundation, as per example below.
Medical waste is currently managed via an old medical waste incinerator; which also manages the associated medical waste delivery and ash removal arrangements.Pathological waste: organs, tissues, surgical specimens, bodily fluids removed during surgery or autopsy.  Mix and moisture content not known.Allow for weekly deliveries @ 8 hour per day operation = 11 kg per hour […]
Incinerate: medical waste and general waste Capability to burn waste: ·         Use: For medications ·         With Chassis to be Mounted in truck/lorry ·         May have a primary and secondary combustion chamber ·         Must have a dilution chamber ·         Ability: 100 Kgs per hour
Items/Model TS250(PLC) Picture Principle Waste Incineration Treatment Burn Rate Average 250 kg/hour Feed Capacity Average 400kg/feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 2000L Internal Dimensions 210x88x110cm Secondary Chamber 1000L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 2.0Kw Oil Consumption (kg/hour) Typical 24.2(DO) Gas Consumption (m3/hour) *** Temperature Monitor Digital Display […]
General specifications of a 100 kg/hr incinerator No. Description Parameter value     model   HICLOVER YD100 1 Machine working mode Oil + Power Oil + Power 2 Voltage 220V C 3 phase or 1 phase 220V 1P 3 Oil consumption (lit/hr) Average 25-32 lit/hr/chamber Average 33Liters/hour/total incinerator 3 burners 6 Incineration rate 100 kg/hr […]
1. GENERAL SPECIFICATIONS: The incinerator for medical waste needs to be designated for the destruction of all kinds of waste produced by the Center for Health (waste type hospital, clinic, medical laboratory for destructive capacity of 30kg / h). Avoid development of black smoke and dust formation tine loading of waste; . Afterburner ? 1 […]