Burners

shed between 5000-10000 pound per hour.Mostly waste from petroleum storage tanks. Building and construction, installment and 6 months upkeep expense including specifications.CMSD for Double Chamber Rotating Klin Kind Incinerator (1st Chamber temperatur less than 850 level centrigrade & & 2nd Chamber Temperature Level less than 1200 c with exhaust pipeline 100 meter long with discharge gas filtering mechanism ), Hydroclave (Clinical) with anciliary devices operating standards: Temperature 250-275 degree feren, Stress 15-35PSI, Sanitation time 30 minus, Establish capacity -463 kg. 2 Burners for a health care facility in VN. The expected ability is roughly 1,000 kg every day.

Categories: