{"id":7737,"date":"2023-02-10T03:11:07","date_gmt":"2023-02-10T03:11:07","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=7737"},"modified":"2023-02-10T03:11:07","modified_gmt":"2023-02-10T03:11:07","slug":"capacity-of-destruction-in-weight-60-kg-h","status":"publish","type":"post","link":"https:\/\/www.hiclover.com\/backup\/capacity-of-destruction-in-weight-60-kg-h\/","title":{"rendered":"Capacity of destruction in weight 60 Kg\/h"},"content":{"rendered":"<p> Quantity: Two [2] with complete accessories.  <\/p>\n<p> Kinds of wastes being used: GENERAL WASTE.Polyester, polypropylene, polystyrene, vinyl acetate plastic, synthetic <\/p>\n<p> plastics,<br \/>\n&#8211; Assumption: general hospital beds 50 percent, surgery beds 50% for the 100 bed hospital instance, while this <\/p>\n<p> ratio is 30-70% for the other cases<br \/>\n* Frontage of loading door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating <\/p>\n<p> from refractory.<br \/>\n* A secondary shot of air to ensure perfect oxygen content.<br \/>\n6.\u00a0\u00a0 \u00a0 The incinerator must avoid the discharge of black smoke and dust that is fine, (Smokeless) during the loadings.<br \/>\n* Burner with fuel, mono-bloc casting guiding type with flat flame, lighting and security of\u00a0\u00a0\u00a0\u00a0 electronic <\/p>\n<p> ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.<br \/>\n* Carcass in strong sheet steel with support of connection.<br \/>\nNatural rubber, synthetic rubber, polyurethane sheet, and bulky films, solids and<br \/>\n22.  Process Filtering system: Scrubber to be cited as optional<br \/>\n&#8211; particles that can be easily sorted<br \/>\n* Electro-ventilator distributing the secondary atmosphere, the regulation of the air flow being carried out by valves and <\/p>\n<p> after the control of the automatic cycle.<br \/>\n&#8211;\u00a0 global standards and waste creations assumptions should employ<br \/>\nWould it be possible to give us information on the capacity of incinerator we want <\/p>\n<p> on this island.   Incinerator to dispose our daily normal mortality for this size of the farm.1. Can the <\/p>\n<p> 100kg\/hr burn solid waste\/hazardous waste like expired paints,waste oil or chemicals.<br \/>\n19.\u00a0\u00a0 \u00a0 A control box ensuring the whole cycle of combustion.  <\/p>\n<p> 20.\u00a0\u00a0 \u00a0 Fan:<br \/>\n23.  Emission Standards Compliance: BS 3316 or equivalent standard<br \/>\n&#8211; Chemical waste solids and liquids, waste oil and other difficult-to-handle items <\/p>\n<p> The\u00a0 machines will be certified for operation from PME after passing website investigations.Manual load twin chamber <\/p>\n<p> incinerator for medical waste to burn 50kg\/hr on continuous operation, with Main temperature in the area of <\/p>\n<p> 800degC minimal and 1200degC or more in the Secondary chamber, complete with charging doorway, Ash doorway, Air and see <\/p>\n<p> vents, auxiliary air system with adjustable dampers, burners and burner control system and ignition device, the whole to <\/p>\n<p> meet NEMA requirements and other global standards.  \u0417\u0434\u0440\u0430\u0432\u0441\u0442\u0432\u0443\u0439\u0442\u0435!    \u0421\u0442\u043e\u0438\u043c\u043e\u0441\u0442\u044c \u0438 \u0434\u043e\u0441\u0442\u0430\u0432\u043a\u0430 \u0434\u043e \u0433.\u0410\u043b\u043c\u0430\u0442\u044b \u041a\u0430\u0437\u0430\u0445\u0441\u0442\u0430\u043d <\/p>\n<p> The technical details we care about are: <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Capacity (burning capacity of waste per hour).  150kg\/hour. Incinerator with 300l waste chamber <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Construct materials, 5mm High quality light steel structure; 100 mm high quality refractory lining.  <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 High Temperature paint finish.we have two hospitals,more then 20 dentist offices,and over 50 doctor offices.<br \/>\n5.\u00a0\u00a0 \u00a0<br \/>\nNature: Calcium<br \/>\n\u2022\u00a0\u00a0 \u00a0The Temperatures of combustion: Minimum will be 850oC and max 1400oC<br \/>\n21.\u00a0\u00a0 \u00a0 Controls and regulations:\n<\/p>\n<p> medical waste incinerator solutions and prices for 100 bed \/ 500 mattress \/ 1000 mattress \/ 3000 bed hospitals.<br \/>\n23.\u00a0\u00a0 \u00a0 The installed incinerator must endure a 1 year guarantee.<br \/>\n\u2022\u00a0\u00a0 \u00a0Post combustion: >1100oC.<br \/>\n16.\u00a0\u00a0 \u00a0 The supplier must provide\u00a0 necessary information for the best of\u00a0 the setup<br \/>\n* Burner of light of waste, with gas, regular mono-bloc casting guiding\u00a0 plunging flame, lighting and security of <\/p>\n<p> electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.<br \/>\n11.\u00a0\u00a0 \u00a0 The Inner diameter of the Chimney: \u00d8 400 and its height: 8 m<br \/>\n13.\u00a0\u00a0 \u00a0 The Dimension of the door for loading in cm: 70&#215;70.<br \/>\n* A regulator with digital viewing for the temperature of combustion.<br \/>\n.  Nature: 42 percent of Al203<br \/>\n4.\u00a0\u00a0 \u00a0 Design Specification : Types A, B, C, D, and E of medical waste<br \/>\n2.\u00a0\u00a0 \u00a0 It should be able to operate not less than 10 hours\/day<br \/>\nThickness\u00a0\u00a0 \u00a0: \u2265150 mm<br \/>\n* A timer with flexible temporization for the regulation of each burner.<br \/>\n22.\u00a0\u00a0 \u00a0 The supplier must give batches of spare pieces of first urgency and consumable of the incinerator.<br \/>\n* A sheath of evacuation of the gases burnt.<br \/>\n23.  Capacity to treat Plastic: Not less than 40 percent by weight<br \/>\n\u2022\u00a0\u00a0 \u00a0Nature: Calcium silicate.<br \/>\n* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium <\/p>\n<p> and insulates bricks to be able to assure a minimum temperature on\u00a0\u00a0 the outside sheet metal.<br \/>\n* Electric box.  <\/p>\n<p> 21.  The de- ashing must be done in the base of the combustion chamber or the deashing must be Automatic or manual <\/p>\n<p> batch p ashing.<br \/>\n9.\u00a0\u00a0 \u00a0 The incineration should be wholly free from visible smoke in addition to offensive odours.<br \/>\n14.\u00a0\u00a0 \u00a0<br \/>\n.<br \/>\n15.\u00a0\u00a0 \u00a0 Fuel : diesel<br \/>\nControl box watertight to dust, including: <\/p>\n<p> * A switch circuit breaker for each engine (ventilators and burners).<br \/>\nFrom the mill; it will include curative and preventative maintenance, and using machine, etc <\/p>\n<p> 18.\u00a0\u00a0 \u00a0 A chamber of post combustion of gases<br \/>\n3.\u00a0\u00a0 \u00a0 This incinerator must be able to destruct all combustible wastes produced by hospitals, private practices, <\/p>\n<p> laboratories, institutes, etc&#8230;<br \/>\n* A burner of light which the use is restricted to the ignition of waste.<br \/>\nThis incinerator with&#8221;PYROLYTIC&#8221; combustion must have:<br \/>\nNature: 65% of Al203<br \/>\n8.\u00a0\u00a0 \u00a0 It should be able to hold emission in the second burn with gasoline residence of less than two seconds.<br \/>\n2. What about the heat generated during burning,are there windows or air flow into the containers.  <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Consumption of power and fuel.  Hospital waste disposal system for a hospital job <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ash removal odor.The incinerator is for HAZARDOUS WASTE and SOLID WASTE and minimal carbon monoxide.  <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Automatic curing process temperature controlled chamber.Incinerator with 150l waste chamber <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Secondary chamber.   Have you got plans for above incinerators revealing floor dimensions,height.   What materials should be used for the FLOOT, WALLS, ROOF ETC.1) The only consumable required for the system TS100 <\/p>\n<p> (PLC) is Oil( diesel) is that OK?  <\/p>\n<p> two ) from the technical specification: petroleum consumption (Kg\/hour) is between 14&#8211;28) do you mean is liters\/hour?  <\/p>\n<p> instance the incinerator will be operating for 10 hours per day means the oil consumption will be 140 Liters or more?  <\/p>\n<p> 3) Chimney type stainless steel.  How about main body construction materials?if there are more two option of body <\/p>\n<p> construction materials for greater life <\/p>\n<p> 3.  Send info about electricity, ventilation, fire protection, exhausts, chimney etc <\/p>\n<p> 4. Do you have prefabricated shelters?Installation of waste disposal system (biomedical) 500kg capacity model, MP 500 <\/p>\n<p> medical incinerator.  <\/p>\n<p> 5.  We see you have container shelters.  Send us price quote for this thing <\/p>\n<p> 1.\u00a0\u00a0 \u00a0 Capacity of destruction in weight: 60 Kg\/h.<br \/>\n&#8211; Items that readily degenerate such as paper, wood, leather and garbage<br \/>\n* A regulator with digital viewing for the temperature of post combustion.<br \/>\n25.\u00a0\u00a0 \u00a0 The technical training of operators will have to be supplied and given by a technician<br \/>\n17.\u00a0\u00a0 \u00a0 A combustion chamber of waste:<br \/>\n7.\u00a0\u00a0 \u00a0 It should be able to reduce the volume of wastes by 98%.<\/p>\n<p>18.\u00a0\u00a0 \u00a0A chamber of post combustion of gases<br \/>\n* A burner of combustion of gases,<br \/>\n* A device of injection of air allowing a total re-combustion of gases,<br \/>\n* A device of air inlet of cooling of waste gases,<br \/>\n* A sheath of evacuation of the gases burnt.<br \/>\n* Carcass in strong sheet steel with support of connection.<br \/>\n* Composition of the refractory;<br \/>\n\u2022\u00a0\u00a0 \u00a0Refractory concrete :<br \/>\n\uf0a7\u00a0\u00a0 \u00a0Thickness\u00a0\u00a0 \u00a0: \u2265150 mm<br \/>\n\uf0a7\u00a0\u00a0 \u00a0Nature: 65% of Al203<br \/>\n\u2022\u00a0\u00a0 \u00a0Insulate in fibrous panel :<br \/>\n\uf0a7\u00a0\u00a0 \u00a0Thickness: \u226585 mm<br \/>\n\uf0a7\u00a0\u00a0 \u00a0 Nature: Calcium<br \/>\n* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of\u00a0\u00a0\u00a0\u00a0 electronic<\/p>\n<p>ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.<br \/>\n* A secondary injection of air to ensure perfect oxygen content.<br \/>\n19.\u00a0\u00a0 \u00a0A control box ensuring the complete cycle of combustion.<\/p>\n<p>20.\u00a0\u00a0 \u00a0Fan:<br \/>\n* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and<\/p>\n<p>following the control of the automatic cycle.<br \/>\n21.\u00a0\u00a0 \u00a0Controls and regulations:<br \/>\nControl box watertight to dust, including:<\/p>\n<p>* A switch circuit breaker for each engine (ventilators and burners).<br \/>\n* A timer with adjustable temporization for the regulation of each burner.<br \/>\n* A regulator with digital watching for the temperature of combustion.<br \/>\n* A regulator with digital watching for the temperature of post combustion.<br \/>\n* Electric box.<\/p>\n<p>21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual<\/p>\n<p>batch de ashing.<br \/>\n22. Process Filtering system: Scrubber to be mentioned as optional<br \/>\n23. Emission Standards Compliance: BS 3316 or equivalent standard<br \/>\n23. Capacity to treat Plastic: Not less than 40% by weight<br \/>\n24. CE Manufacturing Compliance: BS EN 746-2-1997<br \/>\n22.\u00a0\u00a0 \u00a0The supplier must give batches of spare parts of first urgency and consumable of the incinerator.<br \/>\n23.\u00a0\u00a0 \u00a0The installed incinerator must bear a one year guarantee.<br \/>\n24.\u00a0\u00a0 \u00a0The supplier shall perform an onsite installation of the incinerator.<br \/>\n25.\u00a0\u00a0 \u00a0The technical training of operators will have to be provided and given by a technician<br \/>\nfrom the factory; it will consist of curative and preventive maintenance, and the use of machine, etc<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Quantity: Two [2] with complete accessories. Kinds of wastes being used: GENERAL WASTE.Polyester, polypropylene, polystyrene, vinyl acetate plastic, synthetic plastics, &#8211; Assumption: general hospital beds 50 percent, surgery beds 50% for the 100 bed hospital instance, while this ratio is 30-70% for the other cases * Frontage of loading door seals gone up on hinges, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2022,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[20],"tags":[],"class_list":["post-7737","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-waste-incinerator"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/7737","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/comments?post=7737"}],"version-history":[{"count":0,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/7737\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media\/2022"}],"wp:attachment":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media?parent=7737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/categories?post=7737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/tags?post=7737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}