{"id":5661,"date":"2026-05-07T11:06:53","date_gmt":"2026-05-07T11:06:53","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=5661"},"modified":"2026-05-07T11:06:53","modified_gmt":"2026-05-07T11:06:53","slug":"incinerator-capacity-of-destruction-of-350-kg-hour","status":"publish","type":"post","link":"https:\/\/www.hiclover.com\/backup\/incinerator-capacity-of-destruction-of-350-kg-hour\/","title":{"rendered":"Incinerator capacity of destruction of 350 kg\/hour"},"content":{"rendered":"<p> &#8211; Incinerator capacity of destruction of 350 kg\/hour, calorific value of waste will be 13-25 MJ\/kg <\/p>\n<p> [3,500 kcal\/kg] and maximum heat capacity 1,225,000 kcal\/hr.  <\/p>\n<p> &#8211; Incinerator destruction capacity will be 8.4 tons\/day and performance time will be 24 hr. \/day.  <\/p>\n<p> &#8211; Waste will be through automatic feeding system into the incinerator.  <\/p>\n<p> -The temperature will modulated in varying flow and percent in oxygen, combustion gas is re-burned <\/p>\n<p> from the re-combustion[secondary] chamber at a temperature of minimum 1,100 C during 2 minutes.  <\/p>\n<p> &#8211; Control panel will be fitted with a practical synoptic view showing the working situation of the whole <\/p>\n<p> incinerator and controlled by DCS\/PLC system.  <\/p>\n<p> &#8211; Gas treatment system will honor the EE standard [Directive 2000\/76\/EC-4\/12\/2000.  <\/p>\n<p> &#8211; TOC of slag and bottom ashes will be 3% of the dry weight.  <\/p>\n<p> &#8211; Installation will be totally free from visible smoke.  <\/p>\n<p> &#8211; Incinerator will be designed as a Packaged unit, having electrical connection pre-wired and closing pipes <\/p>\n<p> set up.  <\/p>\n<p> &#8211; Incinerator will have automatic de-ashing system with upward direction.  <\/p>\n<p> &#8211; Incinerator will have flue gas treatment system inclusive [emergency by-pass stack, gas heating system, <\/p>\n<p> two reactors and particulates filtering system] and guarantee of emissions out of incinerator.  <\/p>\n<p> &#8211; Training of AKU staffs at website.  <\/p>\n<p> &#8211; Site may be inspected and examine existing ATI machine, capacity 150 kg\/hr. in 24 hour operation.  <\/p>\n<p> &#8211; Present infrastructure space is available in cellar, 100&#8242; Length\u00a0 x 30&#8242; wide x 20&#8242; Height for 2nd Incinerator.  <\/p>\n<p> &#8211; Present chimney length is 12 meter, and width is 24&#8243;dia.  <\/p>\n<p>&#8211; Existing chimney length is 12 meter, and width is 24\u201ddia.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#8211; Incinerator capacity of destruction of 350 kg\/hour, calorific value of waste will be 13-25 MJ\/kg [3,500 kcal\/kg] and maximum heat capacity 1,225,000 kcal\/hr. &#8211; Incinerator destruction capacity will be 8.4 tons\/day and performance time will be 24 hr. \/day. &#8211; Waste will be through automatic feeding system into the incinerator. -The temperature will modulated [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2020,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[20],"tags":[],"class_list":["post-5661","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-waste-incinerator"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/5661","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/comments?post=5661"}],"version-history":[{"count":1,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/5661\/revisions"}],"predecessor-version":[{"id":9056,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/5661\/revisions\/9056"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media\/2020"}],"wp:attachment":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media?parent=5661"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/categories?post=5661"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/tags?post=5661"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}