{"id":4952,"date":"2026-04-02T15:20:47","date_gmt":"2026-04-02T15:20:47","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=4952"},"modified":"2026-04-02T15:20:47","modified_gmt":"2026-04-02T15:20:47","slug":"waste-disposal-burner-2","status":"publish","type":"post","link":"https:\/\/www.hiclover.com\/backup\/waste-disposal-burner-2\/","title":{"rendered":"waste disposal burner"},"content":{"rendered":"<p>  Incinerator but the dimension of chamber > 2000 x >> 1200 mm.  Prepare for melt FLUID Waste +\/- 20 liter\/hr.<br \/>\nThe chamber of the incinerator should be able to hold about 200 &#8211; &#8211; 250 kg of waste in an offered time.  edical Waste Incinerators.<br \/>\nThe mobile system is our concern then the fixed systems.   The mobile system is our priority then the fixed units.<br \/>\n4.  We need just dual chamber dual burner incinerator.<br \/>\nB: Burning capacity per hour, to recognize how much time it will definitely require to shed 1 set and what&#8217;s cooling timem for every one.<br \/>\nD: The vast majority of systems will definitely be worked on Gas, so I need to recognize the necessary pressure of gasoline in psi to operate the machine with no problem.<\/p>\n<p> 2. What is your minimum capability and also maximum capability burner. <\/p>\n<p> 3. You do give secodn hand burner in good working problem.<br \/>\n4. We require just dual chamber dual burner incinerator.<br \/>\n5. Please send us DEFRA and also DADR authorization records by attachment, copy of ISO and also recap of gas emmission report from incinerators. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Incinerator but the dimension of chamber > 2000 x >> 1200 mm. Prepare for melt FLUID Waste +\/- 20 liter\/hr. The chamber of the incinerator should be able to hold about 200 &#8211; &#8211; 250 kg of waste in an offered time. edical Waste Incinerators. The mobile system is our concern then the fixed systems. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2012,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[20],"tags":[],"class_list":["post-4952","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-waste-incinerator"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/4952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/comments?post=4952"}],"version-history":[{"count":1,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/4952\/revisions"}],"predecessor-version":[{"id":8938,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/4952\/revisions\/8938"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media\/2012"}],"wp:attachment":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media?parent=4952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/categories?post=4952"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/tags?post=4952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}