{"id":3782,"date":"2022-03-21T13:35:04","date_gmt":"2022-03-21T13:35:04","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3782"},"modified":"2022-03-21T13:35:04","modified_gmt":"2022-03-21T13:35:04","slug":"incineration-combustion-chamber","status":"publish","type":"post","link":"https:\/\/www.hiclover.com\/backup\/incineration-combustion-chamber\/","title":{"rendered":"incineration combustion chamber"},"content":{"rendered":"<p> Supervision of installation of the new incinerator set shall be provided by the successful Bidder while labor <\/p>\n<p> and heavy duty equipment shall be provided by CEB.  <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0  The successful Bidder shall submit to CEB, prior to shipment of the incinerator set, its processes for the <\/p>\n<p> installation of the incinerator and exhaust chimney.  This should include all mechanical, civil and electrical drawings <\/p>\n<p> and detailed methodology for successful installation of the incinerator collection.  It shall also have preliminary tests <\/p>\n<p> that need to be carried on the incinerator unit.  .   The successful Bidder shall provide all necessary test equipment ( test kit for emission measurements) for <\/p>\n<p> carrying out of tests during testing &#038; commissioning of\u00a0 the incinerator collection.  .  The successful Bidder shall be <\/p>\n<p> responsible for the satisfactory completion of all tests and remedial action in case of any anomaly.  Corrective action <\/p>\n<p> by the successful bidder shall be prompt and to the satisfaction of the CEB Engineer.   Scheduled date for commencement of supervision of installation, testing &#038; commissioning works shall be <\/p>\n<p> agreed between the successful Bidder and CEB <\/p>\n<p> 1 Burning Capacity 200 kg\/hr <\/p>\n<p> &nbsp; <\/p>\n<p> 2 Chamber Dual <\/p>\n<p> &nbsp; <\/p>\n<p> 3 Fuel Source type Gas <\/p>\n<p> &nbsp; <\/p>\n<p> 4 Optional fuel source Diesel ( Rate to be quoted separately) <\/p>\n<p> &nbsp; <\/p>\n<p> 5 Temperature?  Range: <\/p>\n<p> &nbsp; <\/p>\n<p> Min: 900 <\/p>\n<p> &nbsp; <\/p>\n<p> Max: 1500 <\/p>\n<p> &nbsp; <\/p>\n<p> Must have <\/p>\n<p> &nbsp; <\/p>\n<p>?  Temperature Tracking \/ Thermostat Control\/ <\/p>\n<p> &nbsp; <\/p>\n<p> Constant Run Fan <\/p>\n<p> Hospital waste incinerator <\/p>\n<p> Capacity: 50 Kg \/ Hour <\/p>\n<p> Brand new complete working <\/p>\n<p> Burners: Diesel (Preferably dual gasoline \/ gas ) <\/p>\n<p> Primary and secondary chamber <\/p>\n<p> Environment friendly <\/p>\n<p> Manual loading and unloading <\/p>\n<p> WASTE INCINERATOR <\/p>\n<p> &nbsp; <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 150 KG\/HR <\/p>\n<p> &nbsp; <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Compliant with EU rules, Directive 2000\/76\/EC <\/p>\n<p> &nbsp; <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Fuel type: Diesel <\/p>\n<p> &nbsp; <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Easy management and maintenance <\/p>\n<p> &nbsp; <\/p>\n<p> &#8211;\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Temperatures: <\/p>\n<p> &nbsp; <\/p>\n<p> 850 deg C for municipal waste <\/p>\n<p> &nbsp; <\/p>\n<p> 1000 deg C for medical waste <\/p>\n<p> &nbsp; <\/p>\n<p> 1100 deg C for harmful waste containing halogenated organic compounds with material of chlorine or its compounds.  <\/p>\n<p>&nbsp;<\/p>\n<p>1000 deg C for medical waste<\/p>\n<p>&nbsp;<\/p>\n<p>1100 deg C for dangerous waste containing halogenated organic substances with content of chlorine or its compounds.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Supervision of installation of the new incinerator set shall be provided by the successful Bidder while labor and heavy duty equipment shall be provided by CEB. &nbsp; &nbsp; ?\u00a0\u00a0\u00a0\u00a0 The successful Bidder shall submit to CEB, prior to shipment of the incinerator set, its processes for the installation of the incinerator and exhaust chimney. This [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2005,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[20],"tags":[],"class_list":["post-3782","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-waste-incinerator"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3782","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/comments?post=3782"}],"version-history":[{"count":0,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3782\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media\/2005"}],"wp:attachment":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media?parent=3782"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/categories?post=3782"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/tags?post=3782"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}