{"id":3765,"date":"2022-03-17T01:34:12","date_gmt":"2022-03-17T01:34:12","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3765"},"modified":"2022-03-17T01:34:12","modified_gmt":"2022-03-17T01:34:12","slug":"hazardous-waste-incinerators-in-china","status":"publish","type":"post","link":"https:\/\/www.hiclover.com\/backup\/hazardous-waste-incinerators-in-china\/","title":{"rendered":"hazardous waste incinerators in china"},"content":{"rendered":"<p> Anchor all gear to building floor or construction as shown or as recommended by manufacturer with allowance <\/p>\n<p> for thermal expansion as required.  <\/p>\n<p> &nbsp; <\/p>\n<ol>\n<li>Control and Instrument Panel: Rigidly attach enclosure to structural element of the building. Locate panel so<\/li>\n<\/ol>\n<p> that all control switches and indicators are within 1700 mm (5.5 ft ) of the floor and are located alongside the region <\/p>\n<p> where personnel will be loading the unit.  <\/p>\n<p> &nbsp; <\/p>\n<ol>\n<li>Clean interior and exterior of all equipment before placing in service.<\/li>\n<\/ol>\n<p> &nbsp; <\/p>\n<ol>\n<li>Initially operate incinerator at firing rates and time periods recommended by the manufacturer of the<\/li>\n<\/ol>\n<p> refractory to give proper curing of the refractory.  Provide printed curing instructions from refractory manufacturer <\/p>\n<p> in the site prior to first start up.  <\/p>\n<p> &nbsp; <\/p>\n<ol>\n<li>Personnel Protection for High Surface Temperature: If incinerator has surface temperatures exceeding 40 degrees<\/li>\n<\/ol>\n<p> C (70 degrees F) above ambient, provide removable chain barricades mounted on 1070 mm (3\u00a01\/2 ft ) high removable steel <\/p>\n<p> posts spaced 1200 mm (four feet) on centers.   <\/p>\n<p> Supply yellow polyethylene chain with removable hooks at every post.  Provide sign attached to each chain reading, <\/p>\n<p> &#8220;Caution, High Temperature&#8221;.  <\/p>\n<ol>\n<li>Do you have model YD-500 as a mobile unit? In case of a major crisis in one of the clusters we would like to have<\/li>\n<\/ol>\n<p> the option to move the device closer to the place to avoid transporting the dead cows.  Do you have any mobile <\/p>\n<p> alternative?  <\/p>\n<ol start=\"2\">\n<li>Please elaborate what additional equipment we will need to buy to operate each unit? I need to know the total cost<\/li>\n<\/ol>\n<p> each unit.  <\/p>\n<ol start=\"3\">\n<li>Does the unit need to be under a roof?<\/li>\n<li>How is the loading of the dead cow into the incinerator done?<\/li>\n<li>How is the incinerator emptied?<\/li>\n<li>Are there any limitations on how we should dispose the remains from the incinerator?<\/li>\n<li>Does the unit require a dedicated trained operator? How long does it take to train one?<\/li>\n<li>Do you send your engineer for installation, commissioning and operation?<\/li>\n<li>Assuming we have 3 dead cows a day per incinerator &#8211; how many hours a day it would take to complete the job?<\/li>\n<li>In case of crisis can the unit work continuously 24H a day?<\/li>\n<li>Is there any impact of smoke or smell on the surrounding?<\/li>\n<\/ol>\n<p> &nbsp; <\/p>\n<p> 3.2 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 INSPECTIONS AND TESTS: <\/p>\n<p> &nbsp; <\/p>\n<ol>\n<li>General: Demonstrate to the Department of Veterans Affairs that all equipment complies with requirements. The<\/li>\n<\/ol>\n<p> Contracting Officers Technical Representative (COTR)\/Resident Engineer (RE), or their representative will witness all <\/p>\n<p> tests.  Agents of the pollution control authority which has jurisdiction shall also witness emissions tests.  <\/p>\n<p> Provide two weeks advance notice to the COTR\/RE of all testing.  Pretest all items prior to the last testing that&#8217;s <\/p>\n<p> witnessed from the COTR\/RE.  <\/p>\n<p> &nbsp; <\/p>\n<ol>\n<li>Condition of Equipment after Delivery, Rigging, Placement: After setting equipment on foundations, and prior to<\/li>\n<\/ol>\n<p> making any links to equipment, the Contractor and COTR\/RE jointly shall inspect interior and exterior for damage.  <\/p>\n<p> Correct all damage by replacement or repair to achieve a like new condition.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Anchor all gear to building floor or construction as shown or as recommended by manufacturer with allowance for thermal expansion as required. &nbsp; Control and Instrument Panel: Rigidly attach enclosure to structural element of the building. Locate panel so that all control switches and indicators are within 1700 mm (5.5 ft ) of the floor [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2011,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[20],"tags":[],"class_list":["post-3765","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-waste-incinerator"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3765","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/comments?post=3765"}],"version-history":[{"count":0,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3765\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media\/2011"}],"wp:attachment":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media?parent=3765"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/categories?post=3765"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/tags?post=3765"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}