{"id":3761,"date":"2022-03-15T01:33:34","date_gmt":"2022-03-15T01:33:34","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3761"},"modified":"2022-03-15T01:33:34","modified_gmt":"2022-03-15T01:33:34","slug":"medcial-incinerator-manufacturer","status":"publish","type":"post","link":"https:\/\/www.hiclover.com\/backup\/medcial-incinerator-manufacturer\/","title":{"rendered":"medcial incinerator manufacturer"},"content":{"rendered":"<p> The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests <\/p>\n<p> so as to enable sending of a CEB Engineer for witnessing\u00a0 of\u00a0 the\u00a0 factory\u00a0 tests.\u00a0\u00a0\u00a0  A&#8217;Factory\u00a0 Acceptance\u00a0 Test <\/p>\n<p>&#8216;\u00a0 schedule\u00a0 shall\u00a0 be <\/p>\n<p> &nbsp; <\/p>\n<p> mutually agreed between the successful Bidder and the CEB Engineer.  <\/p>\n<p> NOTE: All fees inclusive of air tickets, food &#038; hotel accommodation, local transport and other living expenses <\/p>\n<p> for the CEB Engineer shall be borne by the successful Bidder.  <\/p>\n<p> The successful Bidder shall submit to the CEB Engineer the following documents prior to dispatch of the incinerator <\/p>\n<p> set.   Certificate of Conformity inclusive of this clause&#8217;We certify that, subject to exceptions or concessions <\/p>\n<p> listed here after, the supplies detailed above were fabricated in compliance with the technical specifications of the <\/p>\n<p> contract, order and that, all inspections and tests having been completed, the supplies comply in every aspect with the <\/p>\n<p> relevant particular specifications, drawings, and relevant standards and regulations in force&#8217;.  <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0  Factory Acceptance Test(FAT) Certificates <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0   Three(3) Complete Sets of As-Built Drawings <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0  Installation and commissioning procedure for the incinerator set.  <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0  Program of works for carrying the installation and commissioning <\/p>\n<p>?\u00a0\u00a0\u00a0\u00a0  Labour\u00a0 and\u00a0 logistic\u00a0 requirement\u00a0 for\u00a0 carrying\u00a0 out the installation\u00a0 and commissioning.  <\/p>\n<p> ?\u00a0\u00a0\u00a0\u00a0  All electrical drawings and wiring diagrams <\/p>\n<p> Type of Waste: To deal with medical waste, categories A, B, C, D,E <\/p>\n<p> Type of incinerator: Pyrolytic <\/p>\n<p> Nominal Burn Speed: 50 to 60 Kg\/hrat\u00a0 3500Kcal\/Kg <\/p>\n<p> Loading: Manual, Batch Load <\/p>\n<p> De ashing: Automatic or manual batch de ashing <\/p>\n<p> The incinerator must prevent the discharge of black smoke and <\/p>\n<p> fine dust, during the loadings <\/p>\n<p> Main Chamber Capacity: 2 -3 m3 <\/p>\n<p> The insulation of the combustion chamber should be composed of <\/p>\n<p> refractory bricks, using a high content of aluminium and insulates, <\/p>\n<p> The plate of combustion in carborundum preventing the fixing of <\/p>\n<p> glass and slags <\/p>\n<p> Hours of operation\/day: >10 hrs <\/p>\n<p> Max operating Temperature: 14000C <\/p>\n<p> Normal Operating Temperature (Main ): >8500C <\/p>\n<p> Operating Temperature (Secondary): >11000C <\/p>\n<p> It should have temperature regulators in electronic watch: <\/p>\n<p> Carbon Content of Ash: <2% <\/p>\n<p> The setup should be wholly free of visible smoke as well <\/p>\n<p> as offensive odours.  <\/p>\n<p> Residence Time in Second Chamber: 2 seconds minimum <\/p>\n<p> The Internal diameter of the Chimney: \u00d8 400 <\/p>\n<p> Height of Stack:\u00a0 >8 m <\/p>\n<p> Burner performance: Automatic On\/Off <\/p>\n<p> Fuel: Diesel <\/p>\n<p> Fuel Consumption at rated capacity: >7 Kg waste\/ltr <\/p>\n<p> Electricity Consumption: <2kW at rated capacity <\/p>\n<p> Operating Voltage: 220-240VAC 50 Hz <\/p>\n<p> Spare Parts: Supply for 1 year quoted as alternative <\/p>\n<p> Consumables: Supply for one year of performance to be mentioned <\/p>\n<p> as alternative <\/p>\n<p> Warranty: Parts and service support: 1 year minimum article <\/p>\n<p> commissioning <\/p>\n<p> Service Support: <72 hours.  <\/p>\n<p> Emission Standards Compliance: BS 3316 or \u00e9quivalent standard <\/p>\n<p> Process Filtering system: Scruber to be mentionned as alternative <\/p>\n<p> CE Manufacturing Compliance: BS EN 746-2-1997 <\/p>\n<p> Design Specification: Types A, B, C, D, and E of medical waste <\/p>\n<p> Installation and Commissioning: Contained in conditions of supply <\/p>\n<p> Training in preventative and curative maintainance and use <\/p>\n<p> of the incinerator: Operator training inclusive in provide <\/p>\n<p> Capacity to treat Plastic: Not less than 40% by weight <\/p>\n<p> Shed of the incinerator <\/p>\n<p> Shelter of the incinerator inclusive in offer (the shelter must have <\/p>\n<p> facilities for hand washing and firefighting).  <\/p>\n<p> This material and equipment must include in the drop of the <\/p>\n<p> incinerator: <\/p>\n<p> *\u00a0\u00a0 Foundation in rubble stone, <\/p>\n<p> * \u00a0 Isolation roofing against humidity; <\/p>\n<p> * Elevation with brick of 20 cm (bloc cement), continuing lintel <\/p>\n<p> (linteau) in reinforced concrete; <\/p>\n<p> *\u00a0 Steel frame (charpente en metal); <\/p>\n<p> * Roofing in sheet B.C.A. 28 BG (Toiture en t\u00f4le),metal gutter, <\/p>\n<p> *\u00a0 Sanitary installation (wash basin, soak way pit of 20 m of depth); <\/p>\n<p> *\u00a0 Ash pit of 30 m3, <\/p>\n<p> * Electrical installation; <\/p>\n<p> * Concreteslab for fixing the incinerator; <\/p>\n<p> * Chanel for evacuation of rain water or waste water <\/p>\n<p> *\u00a0 Wiremesh for aeration up the lintel; <\/p>\n<p> * smoothrougtcasting of walls (interior and outside); <\/p>\n<p> * plinth with cement; <\/p>\n<p> *\u00a0 2 metal doors; <\/p>\n<p> *\u00a0 Enemail paintings inside and latex paintings outside the shield <\/p>\n<p> on walls and on doors; <\/p>\n<p> *\u00a0 Roofing limit (planche de rive); <\/p>\n<p> *\u00a0 Steps for this specification will depend on the size of this <\/p>\n<p> incinerator which will determine the size of the drop of the incinerator.  <\/p>\n<p>on walls and on doors;<\/p>\n<p>*\u00a0 Roofing limit (planche de rive);<\/p>\n<p>*\u00a0 Measures for this specification will depend on the size of the<\/p>\n<p>incinerator which will determine the size of the shed of the incinerator.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests so as to enable sending of a CEB Engineer for witnessing\u00a0 of\u00a0 the\u00a0 factory\u00a0 tests.\u00a0\u00a0\u00a0 A&#8217;Factory\u00a0 Acceptance\u00a0 Test &#8216;\u00a0 schedule\u00a0 shall\u00a0 be &nbsp; mutually agreed between the successful Bidder and the CEB Engineer. NOTE: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2009,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[20],"tags":[],"class_list":["post-3761","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-waste-incinerator"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3761","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/comments?post=3761"}],"version-history":[{"count":0,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3761\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media\/2009"}],"wp:attachment":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media?parent=3761"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/categories?post=3761"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/tags?post=3761"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}