{"id":3749,"date":"2026-04-27T23:18:02","date_gmt":"2026-04-27T23:18:02","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3749"},"modified":"2026-04-27T23:18:02","modified_gmt":"2026-04-27T23:18:02","slug":"pet-animal-cremation-equipment","status":"publish","type":"post","link":"https:\/\/www.hiclover.com\/backup\/pet-animal-cremation-equipment\/","title":{"rendered":"pet animal cremation equipment"},"content":{"rendered":"<p> A chamber of post combustion of gases <\/p>\n<p> * A burner of combustion of gases, <\/p>\n<p> * A device of injection of air allowing a total recombustion of gases, <\/p>\n<p> * A device of air inlet of cooling of waste gases, <\/p>\n<p> * A sheath of evacuation of the gases burnt.  <\/p>\n<p> * Carcass in strong sheet steel with assistance of link.  <\/p>\n<p> * Composition of the refractory; <\/p>\n<p> \uf0b7Refractory concrete: <\/p>\n<p> \uf0a7Thickness: \u2265150 mm <\/p>\n<p> \uf0a7Character: 65% of Al203 <\/p>\n<p> \uf0b7Insulate in fibrous panel: <\/p>\n<p> \uf0a7Thickness: \u226585 mm <\/p>\n<p> \uf0a7 Character: Calcium <\/p>\n<p> * Burner with fuel, mono-bloc casting directing type with horizontal flame, lighting and security of electronic ignition, <\/p>\n<p> permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.  <\/p>\n<p> * A secondary injection of air to guarantee perfect oxygen content.   A control box ensuring the complete cycle of combustion.   Fan: <\/p>\n<p> * Electro-ventilator distributing the secondary air, the regulation of the air flow being completed by valves and <\/p>\n<p> after the control of the automatic cycle.   Controls and regulations: <\/p>\n<p> Control box watertight to dust, including: <\/p>\n<p> &nbsp; <\/p>\n<p> * A switch circuit breaker for each engine (ventilators and burners).  <\/p>\n<p> * A timer with adjustable temporization for the regulation of every burner.  <\/p>\n<p> * A regulator with digital viewing for the temperature of combustion.  <\/p>\n<p> * A regulator with digital viewing for the temperature of postcombustion.  <\/p>\n<p> * Electric box.  <\/p>\n<p> &nbsp; <\/p>\n<p> batch de ashing.  <\/p>\n<p> 22. The supplier must give batches of spare pieces of first urgency and consumable of the incinerator.  <\/p>\n<p> 23. The installed incinerator must bear a 1 year guarantee.  <\/p>\n<p> 24. The supplier shall perforn an onsite installation of the incinerator.  <\/p>\n<ol start=\"21\">\n<li>The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual<\/li>\n<\/ol>\n<p> the factory; it&#8217;ll consist of curative and preventive maintenance, and the usage of machine, etc <\/p>\n<ol start=\"22\">\n<li>Process Filtering system : Scruber to be mentionned as optional<\/li>\n<li>Emission Standards Compliance: BS 3316 or \u00e9quivalent standard<\/li>\n<li>Capacity to treat Plastic: Not less than 40% by weight<\/li>\n<li>CE Manufacturing Compliance: BS EN 746-2-1997<\/li>\n<\/ol>\n<p>22.The supplier must give batches of spare parts of first urgency and consumable of the incinerator.<\/p>\n<p>23.The installed incinerator must bear a one year guarantee.<\/p>\n<p>24.The supplier shall perforn an onsite installation of the incinerator.<\/p>\n<ol start=\"25\">\n<li>The technical training of operators will have to be provided and given by a technician from<\/li>\n<\/ol>\n<p>the factory; it will consist of curative and preventive maintenance, and the use of machine, etc<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A chamber of post combustion of gases * A burner of combustion of gases, * A device of injection of air allowing a total recombustion of gases, * A device of air inlet of cooling of waste gases, * A sheath of evacuation of the gases burnt. * Carcass in strong sheet steel with assistance [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2009,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[20],"tags":[],"class_list":["post-3749","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-waste-incinerator"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/comments?post=3749"}],"version-history":[{"count":1,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3749\/revisions"}],"predecessor-version":[{"id":9024,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3749\/revisions\/9024"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media\/2009"}],"wp:attachment":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media?parent=3749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/categories?post=3749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/tags?post=3749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}