{"id":3058,"date":"2022-01-14T13:14:48","date_gmt":"2022-01-14T13:14:48","guid":{"rendered":"https:\/\/www.hiclover.com\/?p=3058"},"modified":"2022-01-14T13:14:48","modified_gmt":"2022-01-14T13:14:48","slug":"medical-waste-incinerators-8","status":"publish","type":"post","link":"https:\/\/www.hiclover.com\/backup\/medical-waste-incinerators-8\/","title":{"rendered":"medical waste incinerators"},"content":{"rendered":"<p> All tags with text shall be in English.   <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> Earthing System <\/p>\n<p> &nbsp; <\/p>\n<p> All normal non-current carrying metal parts of the panel and related parts shall be secured to a common aluminum <\/p>\n<p> earthbar running the whole length in the switchboard.  <\/p>\n<p> &nbsp; <\/p>\n<p> The earthbar shall be found in the lower part of the frame work and supplied with two termination points for <\/p>\n<p> connection to the main earthing grid.  <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> 2.5\u00a0\u00a0\u00a0\u00a0\u00a0 Ignition Oil Supply <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> MEDICAL WASTE INCINERATOR INTALI8ATION <\/p>\n<p> Design, Supply, install, test and commission medical waste <\/p>\n<p> Incinerator According to the attached specification.  The price shall <\/p>\n<p> include all accessories such as the civil work and spare part <\/p>\n<p> list to make the system complete.  <\/p>\n<p> incinerator burning capacity-250kg\/hr\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 NO\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 1 <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> &nbsp; <\/p>\n<p> Jimma University Referal Hospital <\/p>\n<p> Incinerator <\/p>\n<p> Medical Waste Incinerator <\/p>\n<p> Purpose <\/p>\n<p> for an entire destruction of waste from various hospital services by heat treatment of high temperature in accordance <\/p>\n<p> with EU standard on emission requirement <\/p>\n<p> \uf0b7Waste from health care activities <\/p>\n<p> \uf0b7Infections waste, lab cultures, waste form operation room isolations material in contact with contaminated <\/p>\n<p> patients, waste potentially being infected by pathogenic agents.  <\/p>\n<p> \uf0b7Pathological waste, human fragments, bold, fetus, all body fluids, human cells.  <\/p>\n<p> \uf0b7Sculpts, needles, infusion sets, blades, glass <\/p>\n<p> \uf0b7Pharmaceutical waste.  <\/p>\n<p> \uf0b7Chemical waste lab reagents, disinfectants <\/p>\n<p> \uf0b7Expired drugs.   <\/p>\n<p> Medical waste incinerator: &#8211; Ecological Requirement <\/p>\n<p> -No odor <\/p>\n<p> -No fume <\/p>\n<p> -Definitive treatment of waste <\/p>\n<p> Medical waste incinerator: &#8211; Manufacturing Standards <\/p>\n<p> -UL, CE, ASME, ISA EURO emission standard <\/p>\n<p> 1. Medical waste incinerator <\/p>\n<p> Construction- CS plate shells, FB reinforcement, caste refractory linings, <\/p>\n<p> insulation and\u00a0\u00a0\u00a0 14 gage aluminum coat.  <\/p>\n<p> Type of fuel- Oil fired (Diesel) <\/p>\n<p> Burning Capacity- 250kg\/hr and moisture up to 80% <\/p>\n<p> Duration-8-16\/Continuous <\/p>\n<p> Average fuel consumption- Really little as much as possible <\/p>\n<p> Control Form &#8211; PLC based operation <\/p>\n<p> Operating Temperature- Primary chamber 800c\u00b1 50 <\/p>\n<p> &#8211; Secondary Chamber 1050c \u00b1 50 <\/p>\n<p> Size of incinerator &#8212; Not over 15mx7.20m <\/p>\n<p> Chimney &#8212; Q630x25meter height and 7mm thick CS.  <\/p>\n<p> Combustion efficiency &#8212; 99% <\/p>\n<p> Mode of waste handling &#8212; Semi- Automatic via ram loader.  <\/p>\n<p> Mode of ash handling &#8212; Semi- automatic via grate and ash trolley.  <\/p>\n<p> Pollution control equipment- Dry settlement zone <\/p>\n<p> Doors &#8212; 1- waste charging door in main chamber <\/p>\n<p> 1-Clinker door in main chamber <\/p>\n<p> 1-Ash trolley access door in main chamber <\/p>\n<p> 1-Clean entrance door in secondary room <\/p>\n<p> Burner -2- ignition burner in main chamber <\/p>\n<p> 2-after burner in secondary room.  <\/p>\n<p> Sort &#8211; package mono block-fully automated <\/p>\n<p> Type of burner operation- modulation controller <\/p>\n<p> Forced draught fan- 1- primary air fan <\/p>\n<p> 1-secondary air fan <\/p>\n<p> Fuel storage tank- Capacity-2500liter over grond <\/p>\n<p> &#8211; Material -6mm thick mild steel <\/p>\n<p> -2-gas pump, gate valve, sfety valve, strainer <\/p>\n<p> pipe, pressure gage, check valve, control board <\/p>\n<p> Level indicator.  Etc <\/p>\n<p> Refractory\/insulation thickness- not less than 225mm <\/p>\n<p> Ram loader capacity-0.75m3 <\/p>\n<p> Electrical provide -380v\/3ph\/50 Hz <\/p>\n<p> Finish and painting type- powder coated <\/p>\n<p> Audio\/Visual alarm system- burner lockout, overload fault <\/p>\n<p> Electrical accessories &#8212; primary and secondary chamber temperature <\/p>\n<p> Controller \/indicator, auto controls, electric <\/p>\n<p> Control switches, push buttons, relays contavtors <\/p>\n<p> Thermocouples, burner sequence controllers, <\/p>\n<p> Timers, emergency stop and alarms.  <\/p>\n<p>Level indicator. Etc<\/p>\n<p>Refractory\/insulation thickness- not less than 225mm<\/p>\n<p>Ram loader capacity-0.75m3<\/p>\n<p>Electrical supply -380v\/3ph\/50 Hz<\/p>\n<p>Finish and painting type- powder coated<\/p>\n<p>Audio\/Visual alarm system- burner lockout, overload fault<\/p>\n<p>Electrical accessories \u2013 primary and secondary chamber temperature<\/p>\n<p>Controller \/indicator, auto controls, electrical<\/p>\n<p>Control switches, push buttons, relays contavtors<\/p>\n<p>Thermocouples, burner sequence controllers,<\/p>\n<p>Timers, emergency stop and alarms.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>All tags with text shall be in English. &nbsp; &nbsp; &nbsp; &nbsp; Earthing System &nbsp; All normal non-current carrying metal parts of the panel and related parts shall be secured to a common aluminum earthbar running the whole length in the switchboard. &nbsp; The earthbar shall be found in the lower part of the frame [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2021,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[20],"tags":[],"class_list":["post-3058","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-waste-incinerator"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3058","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/comments?post=3058"}],"version-history":[{"count":0,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/posts\/3058\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media\/2021"}],"wp:attachment":[{"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/media?parent=3058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/categories?post=3058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hiclover.com\/backup\/wp-json\/wp\/v2\/tags?post=3058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}