We are searching for small incinerators with filter (with least minimum pollution) for burning/combusting 5kg/hr, 10kg/hr, 15 kg/hr, 20kg/hr, 25kg/hr to 50kg/hr and 300kg/hr of SOLID ORGANIC DRY AND WET NON-HAZARDUOUS of any sort (like hospital wastes) per day or per hour. Should it be without […]
Our assortment of incinerators cater for small to large scale animal cremation related businesses, such as poultry farms, cattle farms, sheep farms, pig farms, stables, kennels, testing laboratory, catteries, pet crematoriums. The containerized mobile incinerator mounted in ISO container before leave factory, pre-installation, no incineration home […]
1. Solidifier (Fluid waste disposal product) Liquid Waste Solidifier for Water Based Particular Features of Solidifier 2lb jar Effectively solidifies potentially serious infectious waste fast Quickly8 penetrates to solidify blood and body fluid to convert Gels in seconds No shaking required Retrains solidity to prevent […]
Physical /Chemical Characteristics: Boiling Point (_F): N/A Appearance & Odor: Off white, odorless Vapor Pressure(mm Hg): N/A Volatiles (% by weight): N/A Vapor Density (Air =1):N/A Evaporation Rate )n-butylacetate=1): N/A HMIS Classification: Health:1; Flammability: 1 Reactivity Data: Stability: Stable Conditions to Avoid: None Know […]
combustion chamber and one flue gas afterburning chamber. The incinerator must be able to satisfy the following parameters: 1. Treatment capacity of: a) 50 kg waste per hour. 2. Temperature: Main combustion chamber up to 850°C, and in the second chamber > = 1,100 […]
Guide autoclave with vertical loading; gravity displacement type with possibility for Vacuum. Capacity: Up to 12 kg/h Chamber size: >150 Dimensions Material: Stainless steel Temperature: 134 °C Additional information: Minimum autoclave room size shall be 150 liters and shall have […]
The manufacturer must provide a declaration that the pressure vessel is manufactured in compliance with relevant guidelines for pressure equipment. Following accompanying documents should be provided with the treatment system and shall be available at the Site: 1. Operation instructions (like process description). 2. […]
Incinerate: medical waste and general waste Capacity to burn waste: 400 — 500 kg/hr Fuel: Diesel Fuel Consumption: 10 litres/hr maximum Incineration temperature: 950 – 1300 °c Casing: thick (min 5 mm) Stainless steel casing and completely insulated to withstand sea humidity Voltage: 220/240 V or […]
Operational Capabilities PROCESS MINIMUM 1 TON PER DAY OPERATED WITH LIMITED TRAINING REGULAR MAINTENANCE CAN BE COMPLETED WITH LIMITED TRAINING COMPLIES WITH EURO / OR US-EPA EMISSION STANDARDS ABILITY TO BURN WASTE LUBRICANTS (POL) HANDLE ORGANIC SOLIDS (TO INCLUDE RMW) DEPLOYABLE MOBILE 24 HRS OF CONTINUOUS […]
Capacité destructive de 55 Kg/h jour de déchets hospitaliers avec un p? . C. I jusqu’à 3.200 Kcal/Kg 1)Type de déchet hospitalier 2)Pouvoir calorifique inférieur 3.200 kcal/kg 3)Humidité 20 percent 4)Teneur en cendres et/ou inertes 8 percent 5)Capacité destructive nominale 55 kg/h 6)Volume chambre de combustion […]
The smokeshaft should certainly have a solid refractory cellular lining of special type of concrete to resist temperature degrees above 1200oc. The chimney should be tall enough and be at the very least one meter over the greatest structure around. The gas tank (commercial diesel) to […]
5-1- Chambre de post combustion est installée au dessus du foyer de combustion, elle est constituée d’un cylindre métallique revêtu intérieurement d’une couche d’ isolant et d’une couche de matériaux réfractaires. : 2,1 m3 Est dimensionnée pour pouvoir garantir un temps de fumée de 2 secondes […]
Incinerators used will be restricted to daylight hours of operation. This includes shutdown, cleaning and maintenance. Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a different waste stream is to be incinerated. The business […]
The following requirements are to be considered as an essential part of the technical specifications for each equipment type. The system offered shall be made to operate normally under the conditions of different areas in Kenya. These conditions may include but not limited […]
It’s anticipated that the Bidder will cooperate closely with PATH and target Hospitals for the new waste management building/area and will make available all needed technical information, drawings, etc., The following waste streams shall be treated in the new HCW treatment center(s): Infectious waste […]
SECTION V TECHNICAL SPECIFICATIONS OF THE INCINERATOR General Description The plant has to have four different sections that demonstrate three fundamentals of turbulence, residence time and temperature retention. The regulated sections may include but not limited to: Overall plant layout Feed chamber/charging […]
Finally, steam to the coat should shut off, the unloading door is to be opened Then the shaft and mixing arms are reversed to behave as unloading mechanism and should scoop the waste fragments out of the unloading door, onto a conveyor belt or directly into […]
Sterilization time: approx. 30 minutes at 121◦C/1.1 Tavern or approx 15 minutes at 132◦C/2.5 Tavern to reach 6log10 sterility Fragmentation within the chamber: Heavy duty with maximum size of final product
Incinerators to be appropriate for the expert disposal of clinical & & & & medical waste/ rubbish having a better lots capability from the selection of about 1000-1500 Kg. The tough, self-contained burners will provide a exceptionally powerful and effective, secure disposal in addition to be […]
Battery Charger: Must be built in battery charger, rectifier type with transformer, circuit breaker and overload protection plugs into any 220VAC outlet. Steering: A pallet truck style steer handle for easy maneuverability. Wheels: approx. 5″ phenolic rear casters for steering and approx. 4″ phenolic wheels with […]
“Waste chamber Chamber capacity 300 kg Chamber quantity .54m3 Chamber dimensions (outside) Width: 91cm, Height: 86cm Length: 152cm Door opening 66 x 76 cm Height to door 84 cm Height to top of pile 5.4 m Suggested slab dimension (L x W x Thickness) 1.8 m […]
air retention for at least 2 seconds at a temperature of less than 850C, the combustion to be able to achieve the proper effect. ? Must be a two-chamber incinerators, secondary and primary Fuel stoves ? The waste products to reduce the initial volume Potential to […]
Dimensions: World standard: 0.83m(I) x 1.0m(w) x 1.4m(h) Burning efficacy: >98% china double chamber incinerator Features: ? Waste type and burn rate: Designed specifically for use by poultry farmers, game-keepers and for pet cremation. The incinerator will burn up to 50 kg of waste per hour. […]
Number item: 01 unit Can you please send us cataloge detail for Pet Cremation of dogs, cats. – Please services need: General about Cremation system which is appropriate Up to 600kgs per ten-hour day of Form IV pathological waste or red bag waste rated at 2200 […]
18 Electrical supply required 3-phase 19 Auxiliary fuel Diesel or paraffin 20 Main burner 21 Secondary (Later ) burner 22 Kind of burners Automatic pressure jet 23 Output Primary Approx 600 000 kJ/hour 24 Output Secondary Approx 750 000kJ/hour 25 Emission control Heated refractory screen Low […]
Would plant operations be usable on a basis of 24 hours per day, 7 days a week, all year long except for regular and preventative maintenance periods? What volume and characteristics of ash could be produced from these solid wastes valorization? How many hours per year […]
The successful bidder will deliver the incinerator slide in a container. A containerized alternative is also acceptable. incinerator with a closed air surroundings,
Supervision of installation of the new incinerator set shall be provided by the successful Bidder while labor and heavy duty equipment shall be provided by CEB. ? The successful Bidder shall submit to CEB, prior to shipment of the incinerator set, its processes for […]
Incinerator dual chamber with capacity 1.5 m3/batch or 6 m3/ day, electronic thermocontrol range 0‐1200 C, thermocouple, air supply capacity 10m3/ minute, electricity consumption 1.2kWH/ hour, power 3 phase with netral, cooling water sprinkler capacity 5L/ minute, completed with refractory (insulation, castable, ceramic blanket) and PLC […]
Incinerate: medical waste and general waste Capacity to burn waste: 400-500kg/hr Fuel: Diesel Gas Consumption: 10 liters/hr maximum Incineration temperature: 950-1300 degrees centigrade Casing: thick (min 5mm) stainless steel casing and fully insulated to withstand sea humidity Voltage 220/240v or 380/415V Frequency 50Hz Feeding: Automatic Ash/leftovers […]
The incinerator fuel tank shall meet the following requirements: a) The tank shall be installed above ground and according to all of the fuel tank requirements in Section 1015 including secondary containment. b) The tank shall be sized to hold a 14 day supply of diesel […]
I also research their product information and find it don’t require fuel and also not require fan blower but that incinerator can only burn waste with 30%-40% humid. I don’t have yet precise details regarding the project opportunities. I have met with the Environment Minister at […]
Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, patients, disposal workers and anyone else coming into contact with the often hazardous materials discarded by hospitals and other healthcare sites. Hospital waste varies from site to site and the biggest challenge is to dispose of this wide range of waste streams. Incineration is still the preferred way to process medical waste without endangering the heath patients, staff or anyone else coming into contact with them. Clinical waste is costing more and more to dispose of safely. Health Clinics and Health center can now handle their own waste streams using one of our specialist medical incinerators. Destroying hazardous waste at source is by far the most effective and efficient way of handling waste that could potentially spread diseases or viruses. HICLOVER is now offering a full range of medical waste incinerators, designed to provide efficient waste destruction, utilizing best available technologies and environmentally friendly process. Due to the secondary chamber with its 2 second retention period, our medical incinerator range is well suited to process medical waste. Requirement 20% -25% of the full waste created by medical treatment facilities is associated to as hazardous and also might develop a selection of health as well as environmental threats if not managed and also harmed in a correct means. Our products ensure reliable, […]
Fully automatic sequential control provided by internal Secondary chamber pre-heat Burn cycle (variable) Cool down cycle PLC system providing control of: Gas Alternatives Diesel, LPG, Natural or Bio Gas. Average Gas Consumption Diesel: 8 / 10 litres per hour Liquid Propane Gas: 6 / 8 litres […]
Anchor all gear to building floor or construction as shown or as recommended by manufacturer with allowance for thermal expansion as required. Control and Instrument Panel: Rigidly attach enclosure to structural element of the building. Locate panel so that all control switches and indicators are […]
Including:Incinerator: Structure to be specified – A receiving cage for biomedical waste; – A combustion chamber using a chimney using a filter to keep the ashes; Chimney section: about 300 cm; using a minimum height of 6 m Door dimensions: approximately 50×60 cm Supplied with a […]
Test shall be conducted by factory authorized representative of incinerator manufacturer. Demonstrate required weight reduction of specified waste. Waste shall be fed in a single batch to the unit. After termination of manufacturer’so-called burning period, inspect and weigh the residue. Emissions testing may be […]
The incinerator will then take supply from the DO tank through its DO feed pumps to its respective burners. An incorporating meter shall be installed to measure the quantity of DO consumed by the incinerator. The meter will have a digital read out in litres and […]
The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests so as to enable sending of a CEB Engineer for witnessing of the factory tests. A’Factory Acceptance Test ‘ schedule shall be mutually agreed […]
HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce. Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg Control Mode PLC PLC PLC PLC PLC Combustion Chamber 100L 210L 330L 560L 1200L Internal Dimensions 50x50x40cm 65x65x50cm […]
standard type, 11m long,self supporting Capacity-220kgs/hr refuse-hospital waste average moisture-15-20% on fist time DIMENSIONS height: 2710mm span: 2840mm Width; 2450mm loading door opening: 610mm x 610mm Grate/Heath Area: 2.0(square meters) Primary chamber volume: 2.4(cubid meters) secondary chamber volume:2,72(cubid meters0 total quantity: 5,12(cubid meters) minimum stack diameter:560mm […]
heavy Duty Steel casing High Quality refectory lining & insulation 1 x Diesel fired ignition burners operated on / off Front Loading Door (safety catch Independent Ash Elimination Door 2.7 CONTROL UNIT The entire processing cycle and the combined effect […]
The temperature is over the minimum and under the maximum required temperature (e.g 1150? C) of the thermal reactor (partial load). When switching off, only the solenoid valve for the fuel supply closes, the burner fan remains on to cool and protect the burner head. […]
– – – – Guidebook technological observation is delivered with the apparatus with all descriptions of failings along with resolutions. D) Opacity of the smoke demand to not exceed 20% seen from 50 metres with naked eyes. 2. Specification for adherence to OSHA along with other […]
10. An all set built produced space shall be provided for property the incinerator. The area will certainly be created in such a way that vacuum is supplied on all sides and warmth radiation maintained minimum as well as offering the operators an easy convenient environment […]
Pre-programmed PLC controlled Password activated and reversal history indication Motor starter with overload protection Automatic instantaneous stop on hard object in shredder bed Automatic heavy cutting load reversal and re-try , up to three times Control housing Nema type 12 Technical Characteristics of External SHREDDER Controls: […]
{ (adsbygoogle = window.adsbygoogle || []).push({});|} ? The minimum capability of the family pet carcass burner. the Whole carcass of animals (cattle, steeds, ? Clean the heater should surely be simple apparatus,. ? Opening Doors – – – – the closure as well as additionally dependency […]
● must be Fuel 790.{ (adsbygoogle = window.adsbygoogle || []).push({});|} – – Wide door for ash removal. – – Warm immune 5 millimeter steel. 1340. – – Cozy recuperation system. 1320 2 sec. Home Time in Second Chamber. Dimension (mm). ● Able to shed 25-30kg per […]
Capacity: 20KG/Hr, Temp Range: 600 Deg. Fuel Supply: Natural Gas/Diesel Dual Combustion Chamber Complete Scrubbing System (Dual Resultant Gas Washer), Dual Blower, Chimney Height: 8m Electric Supply: 220/240Volt, Single Stage
? Refractory concrete:. Density: ≥ 100 mm. Nature: 42 percent of Al203? Insulate in fibrous panels: Thickness: ≥ 75 mm Nature: Calcium silicate. ? Burner of illumination of waste, with gas, conventional mono-bloc spreading directing plunging fire, illumination and also safety and security of digital ignition, […]


