THREE options are on the table for disposing off Tinian solid waste: incineration, Fukuoka method or […]
Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack […]
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication For incineration, general and pathologicalCapacity 100 C 120 kg/h burn rateType Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time Minimum 8 hours dailyOperating temperature From 850 0C to 1200 0C, Automatic controlledResidual Ash 5 to 10%Construction Constructed from heavy duty mild or aluminized steelOr equal and approved equivalent Insulation material Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock Automatic, Electric typeAsh removal door Provided, for removing resultant bottom ash leftovers from the Primary chamberGratings ProvidedLoading Manual loading of wastePrimary Burner […]
Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack […]
* Burning Rate (50-120kg/hour)* Minimum Operating Temperature (850°ϲ(Primary combustion)* Maximum Operating Temperature (1450°ϲ(Afterburner chamber)* Secondary Burning Capacity (Compulsory)* Density Insulation (20mm high)* Refractory Casting (Minimum 65mm)* Heavy duty refracting lining to withstand (1500°ϲ)* Average burn out time: Maximum (3.0 hours)* Fuel Type (Diesel)* Fuel Consumption in L/hr: (7.5 to 9)* Residence time in secondary chamber (2 sec.)* Residue ash post 100kg (Max. 3.8kg)* Installation period (Maximum 7days)Type : Refractory constructionsSteel Structure 400+ Silica board + Fire Brick andCastable betweenSize : Outside – W 740 x L 1112 x H 790 / Inside – W 400 x L 800 x H 560 (mm)Fire load of Combustion volume : 0.18 m3Fire table area : 0.32 m2Material : SS400 x 6.0T, Silica Board, Fire Brick (SK-36), Castable (HACT-160)Temperature : 700 ~ 900 ℃Residual gas combustion in secondary chambers : ≥ 2secInput door size : W 200 x H 200 (mm)Ash door size : W 300 x H 400 (mm)Type : Refractory constructionsSteel Structure 400+ Silica board + Fire Brick and Castable betweenSize : Outside – W 740 x L 1112 x H 745 / Inside – W 400 x L 800 x H 600 (mm) Fire load of Combustion volume : 0.19 m3 Fire table area : 0.32 m2Material : SS400 x 6.0T, Silica Board 50T, Fire Brick (SK-36), Castable (HACT-160) Temperature : 1000 ~ 1100 ℃ WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel: +86-25-8461 0201 Mobile: +86-13813931455(whatsapp/wechat)Website: www.hiclover.com Email: [email protected]Email: [email protected] Items/Model TS10(PLC) TS20(PLC) TS30(PLC) […]