Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack […]
we are medical waste incinerator manufacturer. Medical waste is posing a growing problem all over the […]
Hiclover(clover incinerator) is brand of Nanjing Clover Medical Technology Co.,Ltd., local in Nanjing China(Twitter: twitter.com/hiclovercom  |Facebook: […]
Principle of the hospital incinerator equipment is incineration/combustion/burn. Generally, the function is waste treatment for Solid […]
Principle of the infectious waste pyrolysis machine china is incineration/combustion/burn. Generally, the function is waste treatment […]
Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, […]
Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point […]
  Incineration is the most environmentally acceptable method of laboratory waste disposal.  Combustion of organic materials […]
Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack […]
Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point […]