Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication For incineration, general and pathologicalCapacity 100 C 120 kg/h burn rateType Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time Minimum 8 hours dailyOperating temperature From 850 0C to 1200 0C, Automatic controlledResidual Ash 5 to 10%Construction Constructed from heavy duty mild or aluminized steelOr equal and approved equivalent Insulation material Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock Automatic, Electric typeAsh removal door Provided, for removing resultant bottom ash leftovers from the Primary chamberGratings ProvidedLoading Manual loading of wastePrimary Burner […]
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication For incineration, general and pathologicalCapacity 100 C 120 kg/h burn rateType Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time Minimum 8 hours dailyOperating temperature From 850 0C to 1200 0C, Automatic controlledResidual Ash 5 to 10%Construction Constructed from heavy duty mild or aluminized steelOr equal and approved equivalent Insulation material Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock Automatic, Electric typeAsh removal door Provided, for removing resultant bottom ash leftovers from the Primary chamberGratings ProvidedLoading Manual loading of wastePrimary Burner […]
small scale incinerator means small burning rate (capacity), average from 5kgs per hour to 20 kgs […]
medical incinerator is incineration equipment for the waste from hospital, clinic,laboratory or other related department. the […]
Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point […]
Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point […]
Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 […]
small scale incinerator means small burning rate (capacity), average from 5kgs per hour to 20 kgs […]