Day: October 11, 2022

The tenderer shall provide hydrostatic oil contents gauge (level index ) or a Centre line near the outlet connection. iv)    2No. Photo-electric cells Two sets of operating and maintenance manuals (both for the incinerator and burners) must also be provided. Including two sets of control schematic diagrams for all of the controls and wiring. 1.1.7   […]
Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door Things Side Loading Door Top Loading Door Reference Price Cheap High cost Manufacture Tech. Easy A litter difficult Safty secure safer Incinerator Shape L/ I L Loading manual big door can be by Forklift Land occupation small big Ash door same with feeding door or […]