Day: December 21, 2021

chemical repetitions to be utilized: 6mm plate steel sheel building 7. Total dimensions shall enable positioning the unit on a cars and truck arrangement. 5. Inlet tension and anxiety: as high as 2 bars; Separate Ash Door Second Heating system (petroleum ) -900,000 btu. Exhaust Stack-46cm x 6m. Weight System-5.700 kg. Dimension “D” -152 centimeters. […]
  930 to 980 C (1700 to 1800 F), but shall not to exceed 1150 C (2100 F). The ash-removal system shall consist of, as   a minimum, the direct manual removal into a sterile   Cyclone air filters shall be provided to remove the larger particulates. Cyclone air separators may be offered with   […]