Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 […]
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication   For incineration, general and pathologicalCapacity    100 C 120 kg/h burn rateType Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time                Minimum 8 hours dailyOperating temperature     From 850 0C to 1200 0C, Automatic controlledResidual Ash                    5 to 10%Construction Constructed from heavy duty mild or aluminized  steelOr equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction        Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door                   Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock                          Automatic, Electric typeAsh removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamberGratings    ProvidedLoading Manual loading of wastePrimary Burner                        […]
THREE options are on the table for disposing off Tinian solid waste: incineration, Fukuoka method or […]
Tags: 8, a, at, clover, co, com, d, de, di, en, for, hiclover, in, large, on, […]
Metro Vancouver is taking more heat over its plan to build a second garbage incinerator, with […]
Size:  940 x860x2700 mmMaterial:  STAINLESS STEEL STACK, REFRACTORY CONCRETE LINING SPECIAL INSULATION MATERIALWith burner:  15 C 20 KWTemperature:   PRIMARY CHAMBER = 800°C AND SECONDARY CHAMBER = 850 – 1200° CSufficient heat generation for secure and complete combustion 600-800 °C in the first chamber and >1000 °C in the second chamberEasy transportation on standard EURO-pallets Constructed in a modular fashion  easy on-site movement and assembly with a minimum of equipment and technical skills;For the destruction of problematic waste like sharps, amputates and body parts, wet or moist matter; Off-gas quality: moderate smoke emissions during one quarter of the total incineration time; no visible emission during three quarters. AS PER INTERNATIONAL STANDARDS The remaining ash approximately 5-10% in weight and below 1% in volume of the original waste AS PER INTERNATIONAL STANDARDS Chimney height at least 5 m above the incinerator 5m ABOVE FROM THE GROUNDTemperature resistance of the lining  at least 1,200 °C Related posts: Leading […]
FARGO, N.D. — California health officials have given notice that North Dakota is one of six […]
Norfolk County Council voted by 48 votes to 30 to terminate the contract for the proposed […]
Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication   For incineration, general and pathologicalCapacity    100 C 120 kg/h burn rateType Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unitOperating time                Minimum 8 hours dailyOperating temperature     From 850 0C to 1200 0C, Automatic controlledResidual Ash                    5 to 10%Construction Constructed from heavy duty mild or aluminized  steelOr equal and approved equivalent Insulation material            Refractory material lining similar or equal to calcium Silicate and hot face combination of heavy duty brickworkInternal Construction        Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory materialCharging Door                   Suitable for manual loading of wastes and with smooth Dear seal equivalent of Ceramic seals with hinges.Door Lock                          Automatic, Electric typeAsh removal door    Provided, for removing resultant bottom ash leftovers                              from the Primary chamberGratings    ProvidedLoading Manual loading of wastePrimary Burner                        […]
Tags: 8, a, at, clover, co, com, d, de, di, en, for, hiclover, in, large, on, […]
Recent Posts