¡¡

Clover Incinerator

Nanjing Clover Medical Technology Co.,Ltd.        

¡¡ ¡¡
¡¡ Call us on  0086-25-8461 0201  [email protected] ¡¡

 

¡¡ ¡¡ ¡¡ ¡¡




¡¡



¡¡

¡¡

 Nanjing Clover Medical Technology Co.,Ltd.
 Tel: +86-25-8461 0201
 Fax: +86-25-8461 0406

 Website: www.cloveridea.com.cn
 Email:
cloverincinerator@Gmail.com

About Us

Small Incinerator

Incinerator YD10C

Incinerator YD20C

Incinerator YD30C

Incinerator YD50C

Medical Incinerator

Incinerator YD30

Incinerator YD50

Incinerator YD100

Incinerator YD150

Incinerator YD300

Incinerator YD500

Incinerator YZ20

Incinerator YZ50

Incinerator YZ100

Incinerator YZ150

Animal Cremation

Incinerator Burn Rate

10kgs per hour

20kgs per hour

30kgs per hour

50kgs per hour

100kgs per hour

150kgs per hour

300kgs per hour

500kgs per hour

Incinerator Burner

Light Oil Burner

Gas Burner

YZ Incinerator

Certificate

How to Buy Incinerator

Market Analytics

Contact Us

¡¡

¡¡

¡¡

¡¡

CLOVER Incinerator

Call us on  0086-25-8461 0201  [email protected]

China Medical Incinerators /  Animal Cremation / Waste Incinerators

¡¡

Model YD-50 
 Burning Rate  50 kgs/hour
Feed Capacity 150 kgs
Paimary Combustion Chamber 900 Liters
Secondary Combustion Chamber 300 Liters
Mix Combustion Chamber Yes
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V/380V
Power 0.7Kw
Fuel Type Diesel Oil/ Natural Gas/LPG
Burner Italy Original
Oil Consumption (Diesel Oil) 12.1--23.9 kg/hour
Gas Consumption (Natural Gas) 9.9--26.1 m3/hour
Internal Dimensions 120 x 90 x 85cm (paimary chamber)
External Dimensions 200 x 160 x 310cm (without chimney)
Temperature Monitor Yes
Oil Tank Capacity(if oil fuel) 300 Liters
Door Opening 62 x 80cm
Chimney Length 5.0 Meters
Chimney Type Stainless Steel
Equipment Gross Weight 4000 kgs
Operation Technical Specifications
Paimary Chamber Temperature 800¡æ--1000¡æ
Secondary Chamber Temperature 1000¡æ-1200¡æ
Residency Time 2.0 Sec.
Burning Efficiency £¾98%
Waste Lower Calorific Power 3000Kcal

OUR TECHNICAL SPECIFICATIONS

medical waste incinerator manufacturer, forbrændingsanlægget,


Capacity of destruction in weight:100kg/h
able to operate not less that 12 hrs/day
must be able to destruct all combustible wastes produced
by hospitals,private clinics,laboratories,institutes ect
Types A,B,C,D AND Efor medical waste
PYROLYTIC Combustion,by Controlling the gasifiaction of waste
must avoid the release of black smoke and fine dust,during the loadings.
It should be ablke to hold the emission in the second burn
able to reduce the volume of waste by 98%
compeltely free from visible smokeand offensive odours
lower calories power LCP of this waste will be 3500 kcal/kg
minimum temperature 850c and max 1400C,post combustion less than 1100C
Internal diameter of the chemney: 0/400 and its height 8m
The volume of the combustion chamber 1.1200L
Diamension of the Door for the loading in CM 70*70
Burner opeartion should be automaticOn/Off
Fuel : Diesel
The Supplier must provide necessary information for the best of the installation
A combustion chamber of waste,perfect tight door for
A Burner of lighting which the use is limited to the ignition of waste.
Frontage of loading with doors seals gone up up on hinges,wheel,of screw plug,flexible joint,
and stuffing insulating out of refractory.
the insulation of the combustion chamber should be composed of refractory bricks,having I high content of
alluminuim and isulates bricks in order to assure a minimum temperature on the outside sheet metal.
Composition of the factory;
Refractory concrete:
Thickness more than 100mm
Nature : 42% of A1203
Insulate in fibrous pannels
Burner of light waste with fuel standard mono-bloc casting guidling plunning flame,lighting
Plate of combustion I Carborundum,avaoidingthe fixing of glass of slags.
A chamber of paosting ,a divece of air intel of the gases burn.
Cracass in strong sheet steel with support of connection.
Composition of the refractoiry
Refractory concrete:Thickness not more than 150mm,nature 65% of a1203,insulating in fibrous panel:
thickness not more than 85mm,nature : calcium
Burner fuel,mono-bloc casting guiding type with horizontal flamelighiting and
A secondary injection of air to ensure perfect oxygen content.
a acontrol box ensuring the compete cycle of oxygen.
Fan: Electro ventlator distributing the secondary air,the regulation of the air flow being carried out by valves and following the control of the automatic
cycle.
Control and regulations
control box watertight to dust,including:
A switch circuit breaker for each engine
Aswitch with adjustable temporization for the regulation of each burner
A regulation with digital watching for the temperature of combustion
A switch regulator with dogital watching for the temperature of postcombustion
Electric box

The de-ashing must be done in the bottom of combustion chamber or the dishing should be automatic or manual batch de ashing
Process filtering system scruber to be mentioned as option
Emision standard compliance BS 3316 OR EQUIVALENT STANDARD
Capacity to treat plastic not less than 40% by weight
CE Manufacturing Complience BS EN 746-2-1997

batches of spare parts of its first urgency and consumable of the incinerator.
The installed incinerator must bear a one year guarantee
Supplier must perform an onsite installation of the incinerator
The technical training of operators will have to be provided and given by a technician from the factory ;it will consist
of curative and preventive maintanance and the use of of machine etc.

Civil WORK AND ANY OTHER VRELATED SERVICES FOR THE INSTALLATION AND TRAINING OF OPERATORS
INCLUDED IN THE INCENARATOR¡¯S PRICE.

House of incinerator inclusive in offer the house must have facilities for hand washing and firefighting
This materials and equipment must include in the shed of the incinerator: foundation in rubble stone,isolation roofing against humudity,elevation
with brick of 20cm bloc cement continuing lintel in reinfored contrete;steel frame(charpente en metal); roofing in sheet B.C.A 28 BG
METAL GUTTER,SANITARY INSTALLATION(*WASH BASIN), soakway pit of 20m of depth;ash pit of 30m3,electrical installation:plinth with cement;
smooth roughtcast of walls (interior and outside cement;20metal doors;email paintings inside and latex painting outside the house
on walls and on doors,roofing limit;measures for thid specifications will depend on the size of the incinerator which determine the size of the shed
of the incinerator etc

¡¡

¡¡

¡¡

¡¡ ¡¡